55
ASPHAL
T OPERA
TIONS
Asphalt Operations
Return
Valve
Closed
Hand Spray Valve
Closed
4 Way Valve
Tank
Valve
Open
Master
Handspray
Valves Off
Transfer Valve
Closed
Transfer Line
Suck Back Valve
Closed
Flush Valve
Closed
Suck Back
Valve
Closed
Transfer Line cap
on and secured
Load Line cap
on and secured
BAR CIRC
(Keyway in 6 o’clock
position - with Spray
switch ON)
OFF
Handspray Valve Position
Figure 72b - Valve Positions for Spraying Through the Standard Spray Bar
Figure 72a - Valve Positions for Spraying Through the Variable Width Spray Bar
WARNING
Do not run the pump above the rated
capacity of 400 GPM. Damage to equip-
ment may occur.
T
o prevent an explosion or fire hazard, do
not operate the burners while spraying.
OFF
Handspray Valve Position
Return
Valve
Closed
Hand Spray Valve
Closed
4 Way Valve
Spray
Tank
Valve
Open
Master
Handspray
Valves Off
Transfer Valve
Closed
Transfer Line
Suck Back Valve
Closed
Flush
Valve
Closed
Suck Back
Valve
Closed
Transfer Line cap
on and secured
Load Line cap
on and secured
Содержание Black-Topper
Страница 18: ...17 PREPARING FOR OPERATION ...
Страница 98: ...97 Etnyre Spraybar Nozzles Application Application US Flow ...