![Etnyre Black-Topper Скачать руководство пользователя страница 35](http://html.mh-extra.com/html/etnyre/black-topper/black-topper_operation-maintenance-safety_2433785035.webp)
34
PREP
ARING FOR OPERA
TION
Figure 37 - Page 2 of Diagnostics Screen
Diagnostics
Page 2
Diagnostics page 2 shows an overview of machine inputs. Position of up to 24 foot switches in the switch bank
and the Master Spray Switch module can be seen. If a switch is up, it will be colored green. If a switch is up, but
still red, it is not giving feedback to the computer and needs to be replaced.
To replace switch, unscrew 6 socket screws on switch panel face plate. Remove face plate and gently pull the
switch straight out. Replace bar feet switch with new P/N 6705048. (Wing module switches are P/N 6705049).
Position and millivolt feedback of the joystick and thumbwheels are shown. When the joystick button is pressed,
it will turn from white to orange. If the thumbwheels or joysticks are not centered in the resting position, a calibration
should be performed in Setup Page 1 screen.
Page 3
Page 3 is for Etnyre Personnel usage only.
Содержание Black-Topper
Страница 18: ...17 PREPARING FOR OPERATION ...
Страница 98: ...97 Etnyre Spraybar Nozzles Application Application US Flow ...