45-8 Preparing the Winch and Work Area
HG12 Winch
Step 3:
Pull jack extension pin
(4)
and push extension
(5)
to the ground. Install
pin in nearest available hole.
NOTE:
The outrigger extension is spring loaded and must be manually pushed
down. Use caution when retracting the extension as it will spring up when the pin
is pulled.
Step 4:
Lower jacks until contact is made with ground. Final adjustment will be
made after downrigger assembly is installed.
NOTE:
The outriggers are stabilizers, although they are capable of supporting
the full weight of the HG12, it is not recommended.
Downrigger Setup
NOTE:
Make sure the cable eye is securely fastened to the mast with the clevises
as shown in the photo. Failure to attach the cable will prevent the mast from being
extended or compressed.
DANGER: Do not allow personnel below the equipment while lowering
equipment into the manhole. Serious injury or death may occur if equipment
falls.
4
5
Содержание Hammerhead HG12
Страница 6: ...This page intentionally left blank ...
Страница 16: ...This page intentionally left blank ...
Страница 24: ...This page intentionally left blank ...
Страница 26: ...15 2 Safety Decals HG12 Winch ...
Страница 27: ...HG12 Winch Safety Decals 15 3 ...
Страница 28: ...15 4 Safety Decals HG12 Winch ...
Страница 30: ...This page intentionally left blank ...
Страница 40: ...25 10 Controls HG12 Winch ...
Страница 46: ...This page intentionally left blank ...
Страница 50: ...This page intentionally left blank ...
Страница 80: ...This page intentionally left blank ...
Страница 92: ...This page intentionally left blank ...
Страница 106: ...This page intentionally left blank ...
Страница 108: ......