Install the Fixture
12
Install the Fixture
Overhead rigging must be performed by qualified personnel. Follow all local and national
codes and recommended practices.
WARNING:
•
The installation location must support a minimum point load of 6 times
the weight of the fixture.
•
The installation must always be secured with a secondary safety
attachment. An appropriate safety cable is supplied.
•
Safety cable attachment must be rated by a safety factor of 6.
•
A supportive and stable surface must be used when the fixtures are
placed on the feet.
•
Never stand directly below the installed fixture when mounting,
removing, or servicing the fixture.
•
All safety and technical aspects of fixture installation must be approved
by a qualified personnel before operation.
•
The installation must be regularly inspected by qualified personnel.
AVERTISSEMENT :
•
L'emplacement d'installation doit supporter une charge concentrée
minimale de 6 fois le poids de l'appareil.
•
L'installation doit toujours être sécurisée par une fixation de sécurité
auxiliaire. Un câble de sécurité approprié est fourni.
•
La fixation du câble de sécurité doit être classée avec un facteur de
sécurité de 6.
•
Une surface d'appui stable doit être utilisée quand les projecteurs sont
placés sur pieds.
•
Ne vous placez jamais directement sous le projecteur lors du montage, du
démontage ou de son entretien.
•
Tous les aspects techniques et de sécurité de l'installation du projecteur
doivent être approuvés par un personnel qualifié avant qu'il ne soit
utilisé.
•
L'installation doit être régulièrement inspectée par du personnel qualifié.