Molift Air Tilt / www.etac.com
4
Installation
The hoist is marked with Safe Working Load (SWL), this should
not exceed rail systems max load capacity.
Minimum required height from floor to rail is 210cm.
Mounting Molift Air Tilt Sling bar
EN
SV
NO
DA
FI
DE
NL
FR
IT
ES
50cm
Min.
210cm
60cm
Hand control
The Molift Air Tilt Hand control has 2 buttons for lifting and
lowering and 2 buttons for tilting the sling bar. The hand control
has an indicator light that will illuminate when battery level is low
and the hoist requires charging
Do not pull hand control to move the hoist
along the rail.
1. Place sling bar under hoist and lower lifting band. DO NOT
LIFT SLING BAR UP TO LIFTING BAND.
2. Align the sling bar in connection point.
3. Push button on locking pin and insert all the way through.
4. Make sure locking pin is properly fastened
5. Push and hold down the button on the locking pin, and pull
to remove locking pin.
6. Insert the plug on cable from actuator on Molift Air Tilt
Sling bar into the connector on Molift Air 350 Tilt.
7. Tighten the connectors sealing ring by turning it clockwise.
Содержание Molift Air Tilt
Страница 2: ......
Страница 64: ...Etac A S Parallelvej 3 DK 8751 Gedved www etac com...