Installation
11
The drop chute from the delivery scope of the
discharge (e.g. from floor agitator) is mounted on the
boiler rotary valve.
Fig. 4-10: Drop chute from the delivery scope of the interme-
diate screw
Grease both drive stubs of the conveyor screw with
Stauffer grease and connect them. Make sure that the
thread is continuous.
Fig. 4-11: Start screw
Install the drop chute on the trough.
Fig. 4-12: Drop chute
Attach a seal to the flange.
Fig. 4-13: Seal
Lift the discharge and carefully insert the ball joint
connection into the opening of the drop chute lower
part.
Ensure that the ball joint lies completely within the
lower part of the drop chute and that it closes.
Содержание BG 1
Страница 1: ...2020 03 12 EN 0000000381 V 003 X 47 0 93118 002 Intermediate Conveyor Screw Operating Instructions...
Страница 6: ...6 www eta co at Technical data 2 Technical data Fig 2 1 Side view Fig 2 2 Top view...
Страница 22: ...22 www eta co at Circuit diagram 9 Circuit diagram...
Страница 27: ......
Страница 28: ...www eta co at www eta co at downloads DOWNLOAD...