1.
2.
3.
.
Connect t
local stan
.
Install the
instructio
.
Plug the t
latch.
the transition
dards.
e first module
ns.
transition cab
Before con
ground wi
device is in
n cable to the
e, nearest to
ble into the c
nnecting mod
res are prope
n the OFF po
17
e junction or
o the transitio
connector of
dules to tran
erly landed a
osition.
r transition bo
on box, acco
the first mo
sition cable,
and the AC s
w
ox according
ording to rack
dule and clo
ensure the n
tring overcur
www.etsolar.c
g to NEC/CEC
king system
se the conne
neutral and
rrent protect
com
C and
ector
tion
Содержание ET-P660250AC
Страница 1: ...AC Module Installation Guide Content for ET P660250AC...
Страница 12: ...Table 1 Mod 10 dule Layout D Diagram w www etsolar c com...
Страница 22: ...Jun nction B Box Top p Left 20 w www etsolar c com...
Страница 23: ...Tw wo String gs Two rows ea 21 ach w www etsolar c com...
Страница 24: ...Tw wo String gs Sing gle Rows 22 w www etsolar c com...
Страница 25: ...Lan ndscape e Two S Strings 23 w www etsolar c com...