www.etsolar.com
18
4.
Install the second module.
5.
Reach under the top edge of the first module and plug in the AC cable from new module.
Close the latch.
NOTE: For end- or edge-mount racking systems, it might be necessary to lift the top of
the module slightly above the frame to reach the plug.
6.
Repeat steps 4 and 5 until you reach the end of the row.
See "Module Preparation" on page 13 for information on preparing the final module in
the string.
If the string will continue to another row, then an extension cable is needed. Plug the
extension cable into the current module and place it in the general vicinity of where the
next module will be installed. Use appropriate cable management strategies to secure
the extension cable.
NOTE: For rail mount systems, lay the extension cable over the rails on which the next
module will be installed. This ensures that the cable remains under the module for
protection from the sun and uses the rails to keep the cable off the roof surface. Once
the module is installed, you can also secure the cable to the module frame with cable
clips, if necessary.
Содержание ET-P660250AC
Страница 1: ...AC Module Installation Guide Content for ET P660250AC...
Страница 12: ...Table 1 Mod 10 dule Layout D Diagram w www etsolar c com...
Страница 22: ...Jun nction B Box Top p Left 20 w www etsolar c com...
Страница 23: ...Tw wo String gs Two rows ea 21 ach w www etsolar c com...
Страница 24: ...Tw wo String gs Sing gle Rows 22 w www etsolar c com...
Страница 25: ...Lan ndscape e Two S Strings 23 w www etsolar c com...