background image

 

 

machinery  is  the  pride  of  the 

facility.  An  advanced  powder-

coating  process  has  also  been 

incorporated  in  the  facility  to 

provide  an  aesthetic  finish  to  all 

the 

laboratory 

equipment 

produced at the facility. We have 

always  been  careful  not  to  sit 

complacently  on  our  laurels  and 

are 

strongly 

committed 

to 

continuously  investing  in  cutting 

edge of fabrication technologies.  

 

World-Class R & D 

At  Esco,  we  understand  that 

being  at  the  cutting  edge  of 

technology  is  the  key  to  our 

survival. 

Hence 

continuous 

investment  in  Research  and 

Development 

(R&D) 

is 

the 

mainstay of our corporate policy. 

Currently, one in every two non-

production  staff  at  Esco  serves 

in  a  R&D  position.  This  is  a 

further  demonstration  of  how 

seriously we take our R&D.  

Most of our R&D is carried out at 

the 

Esco 

Fume 

Filtration 

Technology  Centre 

located  at 

our  corporate  headquarters  in 

Singapore.  

 

 

 

 

 

 

 

This 

centre 

features 

demonstration 

laboratory, 

conference/training  facilities  for 

visitors,  and  various  testing 

laboratories  in  which  state-of-

the-art  research  and  tests  are 

continuously  conducted  in  order 

to  improve  the  performance  of 

our  products.  The  laboratories 

are  equipped  with  a  formidable 

array  of  latest  instruments  - 

properly 

calibrated 

and 

maintained. 

Included 

among 

them  are  particle  counters,  air 

velocity 

meters, 

flow 

visualization  devices,  electrical 

safety  analysers,  and  light/noise 

level/vibration meters. 

 

ISO 9001 Quality Management 

System 

 

 

 

 

 

 

 

 

 

 

 

At  Esco,  quality  and  customer 

satisfaction are our top priorities, 

which  is  why  the  company 

operates  under  an  ISO  9001 

certified  quality  management 

system. Extensive quality control 

and  testing,  carried  out  at  every 

stage  ensures  that  we  deliver 

nothing  but  the  best  to  our 

customers. 

 

ISO 14001 Environmental 

Management System 

Esco  also  practices  responsible 

corporate 

citizenship 

by 

demonstrating 

firm 

commitment to the environment. 

Many  of  our  products  are 

designed to be extremely energy 

efficient,  while  our  cabinets  are 

produced using easily recyclable 

steel. 

 

 

 

 

 

 

 

 

Geared for Global Marketplace 

 

 

 

 

 

 

 

 

Esco  regularly  participates  in 

numerous major international, 

regional and national industry 

trade shows and exhibitions. 

 

Содержание ASCENT OPTI BASIC

Страница 1: ...ASCENTTM OPTI BASIC ASCENTTM OPTI DUCTLESS FUME CABINET USER SERVICE MANUAL Esco SPB SPD User Service Manual Version 4 Released 1 February 2008 Specifications subject to change without notice...

Страница 2: ......

Страница 3: ...larm system which simplifies operation and enhances user safety SPD only Transparent frameless acrylic front window and sides provide a high degree of visibility and operator comfort Energy efficient...

Страница 4: ...2 1 3 Safety 13 1 4 Performance 13 1 5 Cleanability 13 1 6 Operator Comfort 13 1 7 Easy Servicing 14 1 8 Cost Saving 14 1 9 Testing 14 1 10 In House Tested 15 1 11 FiltraCheck Chemical Advisory Servic...

Страница 5: ...aining Your Cabinet 47 5 1 Maintenance Schedule 47 5 2 Self Check Test 48 1 Re certification and Maintenance by Service Personnel 51 1 1 Airflow Verification Cabinet Re Certification 51 1 2 Calibratio...

Страница 6: ...leshooting 65 3 1 Electrical and Mechanical Troubleshooting 65 3 1 1 SPD 3 4AX 65 3 1 2 Software Troubleshooting 69 3 1 3 SPB 2AX 69 Copyright Information 72 U Appendix A Filter Saturation Test 74 App...

Страница 7: ...irectives Directive 2002 96 EC on Waste Electrical and Electronic Equipment WEEE and Directive 2002 95 EC on Restriction on the use of Hazardous Substances RoHS WEEE The objective of the WEEE directiv...

Страница 8: ...accordance with the following directives 72 23 EEC The Low Voltage Directive and its amending directives 89 336 EEC The Electromagnetic Compatibility Directive and its amending directives have been d...

Страница 9: ...ailure to properly describe evidence of loss or damage may result in the carrier refusing to honor a claim Contact delivering terminal to arrange for a claim form and inspection report to be faxed or...

Страница 10: ...onsible for the cabinet s malfunctioning or any sort of damage to people or property arising out of non compliance with the operating instructions laid down in this manual poor maintenance or improper...

Страница 11: ...r state of the art in house testing capabilities for both containment and filtration efficacy have also been independently accredited Esco offers one of the widest ranges more than 7 types of carbon f...

Страница 12: ...testing laboratories in which state of the art research and tests are continuously conducted in order to improve the performance of our products The laboratories are equipped with a formidable array o...

Страница 13: ...21 Changi South Street 1 Singapore 486777 Phone 65 65420833 Fax 65 65426920 E mail ductless escoglobal com Website www escoglobal com ductless USER SECTION 10...

Страница 14: ...not released to the environment unlike in the conventional fume hoods Fully installed systems ready to operate are available at a lower cost than bulky conventional fume hoods An expensive ducting an...

Страница 15: ...efficiency of the hood The ambient temperature of the laboratory and the gas must be kept to a minimum The higher the ambient temperature the lower the adsorptive efficiency of the carbon filters Rel...

Страница 16: ...oads the intelligent blower system automatically adjusts itself to maintain constant airflow This unique feature eliminates the need for constant speed control adjustments thereby ensuring optimum per...

Страница 17: ...centrifugal blowers which employ an energy efficient external rotor type design This helps Esco cabinets deliver excellent performance while keeping the operating cost low at the same time 1 9 TESTING...

Страница 18: ...et is suitable for their application can forward a list of chemicals that they will be handling and their pattern of usage to Esco s FiltraCheck service team A PDF Questionnaire form is available at w...

Страница 19: ...outh Street 1 Singapore 486777 Phone 65 65420833 Fax 65 65426920 E mail ductless escoglobal com Website www escoglobal com ductless USER SECTION CHAPTER 1 BASIC PRODUCT INFORMATION Esco s FiltraCheck...

Страница 20: ...all care should be taken to protect the box from direct impact during the course of moving it b While lifting and moving the box please ensure that the floor jack or mechanical lift truck has entered...

Страница 21: ...possible and or dispose off the packaging material and box in an environmentally responsible manner Please hammer any exposed nail sharp projection on the box s surface prior to disposal For the cabi...

Страница 22: ...teel flat washer for M8 8 Stainless steel spring washer for M8 9 Pan head screw M4 x 12 10 Stainless steel flat washer for M4 11 1 wrench spanner no 13 12 1 Phillips head screwdriver 13 Cord set The f...

Страница 23: ...s are included in your packaging No Parts Quantity 1 Plastic Screws 12 pieces 2 Hexagonal Bolt M8 x 20 3 pieces 3 Stainless Steel Flat Washer for M8 3 pieces 4 Stainless Steel Spring Washer for M8 3 p...

Страница 24: ...s USER SECTION CHAPTER 3 INSTALLING YOUR CABINET 2 Assemble the main top panel joined to back panel and side wall using M8 5 plastic screws to side wall left and right M8 2 metal screws and spring was...

Страница 25: ...PD 3 4AX 3 2 1 List of Parts The following parts are included in your packaging Quantity No Parts SPD 3AX SPD 4AX 1 Plastic Screws 16 pieces 16 pieces 2 Hexagonal Bolt M8 x 20 7 pieces 8 pieces 3 Stai...

Страница 26: ...oglobal com Website www escoglobal com ductless USER SECTION CHAPTER 3 INSTALLING YOUR CABINET 3 2 2 Assembly Guide 1 Join the Baffle Board onto the Back Panel using 4 screws M8 type 2 Join both left...

Страница 27: ...SECTION CHAPTER 3 INSTALLING YOUR CABINET 3 Attach the stainless work top table and the drain pan using M8 4 white colored plastic screws at left and right side 4 Assemble the main top panel joined t...

Страница 28: ...65426920 E mail ductless escoglobal com Website www escoglobal com ductless USER SECTION CHAPTER 3 INSTALLING YOUR CABINET 5 Assemble the front glass acrylic using M4 2 metal screws 6 Finally lock the...

Страница 29: ...ing the protection offered by the cabinet to both the operator and the samples placed inside it Relative Air Velocities Therefore while installing the cabinet it should be located as far away as possi...

Страница 30: ...abinet or the edge of a local exhaust ventilation outlet should be not less than 3000 mm see figure 1d e Any room air supply diffuser should not be within 1500 mm of the front aperture If there are la...

Страница 31: ...i South Street 1 Singapore 486777 Phone 65 65420833 Fax 65 65426920 E mail ductless escoglobal com Website www escoglobal com ductless USER SECTION CHAPTER 3 INSTALLING YOUR CABINET Key to figures 1 a...

Страница 32: ...21 Changi South Street 1 Singapore 486777 Phone 65 65420833 Fax 65 65426920 E mail ductless escoglobal com Website www escoglobal com ductless USER SECTION CHAPTER 3 INSTALLING YOUR CABINET 29...

Страница 33: ...Cabinet 2 is too close to the doorway and its airflow could be influenced by the air inlet too 3 The airflow of cabinet 3 could also be influenced by the air inlet 4 Cabinet 4 is too close to the door...

Страница 34: ...Terms and Conditions on page 7 2 Wipe the interior and exterior of the cabinet with water or a mild household detergent 3 Note This point is only applicable for SPD Connect the cabinet to the main po...

Страница 35: ...wer plug on the power cord 5 The leakage current for all electrical outlets put together should not exceed 2 0 mA 6 At the time of carrying out the Voltage dips short interruptions immunity test flick...

Страница 36: ...rement or simple airflow visualization are insufficient for deciding the safety of cabinets 3 Standardized testing procedures and certification help induce confidence in the tests besides ensuring saf...

Страница 37: ...tion 4 2 3 2 for information on setting the Fan PIN 2 Auxiliary Button 3 Socket Button although present this feature is not applicable for SPD 4 Up and Down Arrow Button To move up and down the menu o...

Страница 38: ...aches 00 00 00 TIMER COMPLETE and PRESS UP KEY message will be displayed with an audible alarm 5 Set or Mute Button To select the menu or sub menu option currently displayed on the LCD screen To proce...

Страница 39: ...light and electrical outlet would be off After reset the system will resume normal operation Note that no data is erased or reset to the default values 4 1 2 HARDWARE RESET Sentinel can also be reset...

Страница 40: ...e menu options thereafter can be prevented SET TIME POST PURGE WARM UP VELOCITY UNIT EXP TIMER TEMP UNIT SETTINGS SET CONSTANT ZERO SENSOR CALIB SENSOR CALIBRATION NEW ADMIN PIN NEW FAN PIN A F MONITO...

Страница 41: ...nges 4 2 1 2 WARM UP TIMER Before the fan becomes fully functional there is a time lag for the purpose of warm up This is to allow some time to the sensors fan and the control system to stabilize Duri...

Страница 42: ...nk Press UP or DOWN arrow button to choose the correct hour value Press SET The minute value will blink Press UP or DOWN arrow button to choose the correct minute value Press SET The second display wi...

Страница 43: ...allows proper calibration and operation of the airflow sensor alarm There are two points that have to be calibrated namely airflow fail point and airflow nominal point More details on this option can...

Страница 44: ...cabinet By default this feature is disabled Please follow the following steps to set a new FAN PIN so as to enable this feature Press SET button to enter the NEW FAN PIN menu The first digit display w...

Страница 45: ...intenance schedule including when to change filter based on the reading of blower hour meter Please refer to the SERVICE SECTION for more details Press SET button to enter the RESET B H M menu Press S...

Страница 46: ...lable options Press MENU to go back to the previous level 4 2 4 1 NORMAL MODE This is the default operation mode When the cabinet is restarted it goes into this mode by default 4 2 4 2 MAINTENANCE MOD...

Страница 47: ...ed below 1 Manufacturer Integra Bioscience Product Fireboy plus Web page http www integra biosciences com fireboy_plus_1_e html 2 Manufacturer Waterpik Product TOUCH O MATIC Bunsen Burner Web page htt...

Страница 48: ...wing guidelines in order to achieve comfortable and healthy working conditions 1 Always ensure that your legs have enough legroom 2 Keep the lower back comfortably supported by your chair Adjust the c...

Страница 49: ...fan has been switched off air from the cabinet may escape due to the thermal currents from inside the cabinet So if you choose to turn off the cabinet you need to carefully adhere to the following gui...

Страница 50: ...Inspect the controls of the services to the ductless fume cabinet for proper operation 2 Clean the exterior surface of the fume hood with damp cloth 3 Determine the face velocity and ensure that ductl...

Страница 51: ...ubes Suitable Connectors tubings Description Color indicator tubes are sealed glass tubes which contains chemicals that react with a specific compound such as toluene ethanol moisture carbon monoxide...

Страница 52: ...the hardware you can perform the tests on compressor air as well as air in storage banks 2 You can perform the tests any time you wish 3 You do not have to contact a laboratory 4 The results are insta...

Страница 53: ...21 Changi South Street 1 Singapore 486777 Phone 65 65420833 Fax 65 65426920 E mail ductless escoglobal com Website www escoglobal com ductless SERVICE SECTION 50...

Страница 54: ...a year Steps to perform certification 1 Turn on the cabinet for 10 minutes to allow the speed control to reach 99 of the target voltage output 2 Check the nominal inflow values in the test report Che...

Страница 55: ...ply voltage For example Esco factory Your laboratory Building supply voltage 230 V 220 V Motor blower voltage 135 V 118 V In this case the motor voltage must be increased from 118 volt to 135 volt by...

Страница 56: ...CALIBRATION OF THE SENTINEL CONTROL Note This section applies only for SPD 3AX SPD 4AX The purpose of calibrating the controller is to let the controller record particular output voltages from the ai...

Страница 57: ...he specifications required by the testing report even though the fan has been set to maximum speed 1 Ensure that the motor is shut off first 2 Lift the head unit and lock it in place by using the stop...

Страница 58: ...SERVICE SECTION CHAPTER 2 PRODUCT SPEC IFICATION CHAPTER 2 PRODUCT SPECIFICATION CONTENTS Engineering Diagram of All Models of Different Sizes Technical Specification Summary Table Electrical Schemati...

Страница 59: ...outh Street 1 Singapore 486777 Phone 65 65420833 Fax 65 65426920 E mail ductless escoglobal com Website www escoglobal com ductless SERVICE SECTION CHAPTER 2 PRODUCT SPEC IFICATION 2 1 SPB Engineering...

Страница 60: ...outh Street 1 Singapore 486777 Phone 65 65420833 Fax 65 65426920 E mail ductless escoglobal com Website www escoglobal com ductless SERVICE SECTION CHAPTER 2 PRODUCT SPEC IFICATION 2 2 SPD Engineering...

Страница 61: ...1 Singapore 486777 Phone 65 65420833 Fax 65 65426920 E mail ductless escoglobal com Website www escoglobal com ductless SERVICE SECTION CHAPTER 2 PRODUCT SPEC IFICATION 2 3 SPB SPD Technical Specific...

Страница 62: ...ingapore 486777 Phone 65 65420833 Fax 65 65426920 E mail ductless escoglobal com Website www escoglobal com ductless SERVICE SECTION CHAPTER 2 PRODUCT SPEC IFICATION 2 4 Electrical Schematic for SPB 2...

Страница 63: ...ingapore 486777 Phone 65 65420833 Fax 65 65426920 E mail ductless escoglobal com Website www escoglobal com ductless SERVICE SECTION CHAPTER 2 PRODUCT SPEC IFICATION 2 5 Electrical Schematic for SPB 2...

Страница 64: ...ingapore 486777 Phone 65 65420833 Fax 65 65426920 E mail ductless escoglobal com Website www escoglobal com ductless SERVICE SECTION CHAPTER 2 PRODUCT SPEC IFICATION 2 6 Electrical Schematic for SPD X...

Страница 65: ...ingapore 486777 Phone 65 65420833 Fax 65 65426920 E mail ductless escoglobal com Website www escoglobal com ductless SERVICE SECTION CHAPTER 2 PRODUCT SPEC IFICATION 2 7 Electrical Schematic for SPD X...

Страница 66: ...1 Singapore 486777 Phone 65 65420833 Fax 65 65426920 E mail ductless escoglobal com Website www escoglobal com ductless SERVICE SECTION CHAPTER 2 PRODUCT SPEC IFICATION 2 8 Electrical Schematic for SP...

Страница 67: ...t current 500mA Electromagnetic interference Hardware requirement PSC backward curve fan Fluorescent light and ballast Sentinel Control comprising of main board relay board interface board and 1x16 LC...

Страница 68: ...model HK E518 A075 120 output is 7 5VDC at its output terminal SMPS is located on the electrical panel and covered by a stainless steel box The way of measurement is to disconnect the 5 pin connector...

Страница 69: ...n supply find out fuse F7 F8 F4 F1 F5 located on relay board pull them out to check 5 Neither FAN LIGHT nor UV can be controlled Please replace the relay board Fan is Off Please switch on the FAN by p...

Страница 70: ...side the cabinet Connection problem Check whether LCD FRC Flat Ribbon Cable has been inserted properly into its socket on the main board Contrast problem Adjust the potentiometer blue color next to th...

Страница 71: ...supply voltage If the supply voltage is lower than the Nominal Voltage value recorded in test report adjust the speed control to get blower s output voltage as specified in the Test Report Test Condit...

Страница 72: ...pped below the fail point see Calibration section for the exact value adjust the speed control to achieve blower output voltage as stated in the Calibration certificate WARNING This step should be car...

Страница 73: ...of capacitor use a multimeter turn selector to capacitance position record the value between two capacitor cables The value should match to the one printed on capacitor body with 10 tolerance for exa...

Страница 74: ...If motor is not running refer to motor silent section Filter loaded Plug in the multimeter to the Motor Voltage Sampling Port Turn the Speed Control to increase the blower voltage by approximately 10...

Страница 75: ...d in this manual and that in the accompanying product are copyrighted and all rights are reserved by Esco Esco reserves the right to make minor design changes periodically without any obligation to no...

Страница 76: ...21 Changi South Street 1 Singapore 486777 Phone 65 65420833 Fax 65 65426920 E mail ductless escoglobal com Website www escoglobal com ductless APPENDIX APPENDIX 73...

Страница 77: ...lter saturation by chemical acid gases There are namely Propan 2 ol challenge test BS 7989 2001 Standard Method using a canister cease to be practicable Method using the burning sulphur BS 7989 2001 S...

Страница 78: ...forming a boundary line When the boundary reaches the top of the flask start the stop clock 5 After 60s take a reading of the concentration of propan 2 ol in the exhaust gas emitted by the fume cupbo...

Страница 79: ...5cm inside the upper rim of the aperture This places the sulphur in the maximum incoming draught and encourages complete combustion 5 Switch on the fume cabinet 6 Light the Bunsen burner with the gas...

Страница 80: ...ebsite www escoglobal com ductless APPENDIX C 1 CALCULATION Rate of release of sulphur dioxide M1 M2 x 750 t cm 3 s 1 Now check your result with the table below Rate of sulphur dioxide relesed cm 3 s...

Страница 81: ...rd this sash height 6 Imagine the face of the fume cupboard divided into nine equal rectangles Stand as far as practicable from the fume cupboard with the sensing heading in the plane of the sash and...

Страница 82: ...Add a b c d e f g h i and divide by 9 to get the average Find the biggest and smallest value of a b c d e f g h i Calculation Biggest minus average Divide the answer by average and multiply by 100 to...

Страница 83: ...bers given in the list represent typical or average conditions presuming that a good pre filtration has removed liquid and or solid impurities which could also be present in the gas air to be cleaned...

Страница 84: ...21 Changi South Street 1 Singapore 486777 Phone 65 65420833 Fax 65 65426920 E mail ductless escoglobal com Website www escoglobal com ductless APPENDIX 81...

Страница 85: ...21 Changi South Street 1 Singapore 486777 Phone 65 65420833 Fax 65 65426920 E mail ductless escoglobal com Website www escoglobal com ductless APPENDIX 82...

Страница 86: ...nstallation BS 7258 3 1994 Laboratory fume cupboards Part 3 Recommendations for selection use and maintenance BS 7258 4 1994 Laboratory fume cupboards Part 4 Method for determination of the containmen...

Страница 87: ...______________________________________________ Fax _____________________________________________________________________________ Email _________________________________________________________________...

Страница 88: ...This page has been intentionally left blank...

Страница 89: ...21 Changi South Street 1 Singapore 486777 Phone 65 65420833 Fax 65 65426920 E mail ductless escoglobal com Visit our website at ductless escoglobal com...

Отзывы: