Figure 9
8
Attach Upper Arms (#6) to Pole (#2), as shown in Figure 7,
using a bolt (#7), two flatwashers (#3), four plastic washers
(#5) and hex nut (#4).
Note: Tighten bolts snug but, do not over tighten. Board
Arms must pivot freely.
If the two Tube Plugs (#9) are not already installed insert
them into open ends of Upper Arm (#6). It may be necessary
to use a rubber mallet to tap plug in.
Figure 7
Figure 8
Slide Actuator Handle (#42) onto shaft on the back of
Actuator (#16). Line up hole in shaft with hole in Actuator
Handle and insert Pull Pin (#41) to secure.
Toaid in the assembly of the backboard lower the lower board
arm (#11), by turning the Actuator Crank, until the lower
arm makes contact with the Safety Stop.
PLACING THE POST ON THE ANCHOR SYSTEM
REQUIRES AT LEAST FOUR CAPABLE ADULTS.
POLE WILL WANT TO LEAN WHILE ATTEMPTING TO
STAND IT UP ON ANCHOR BOLTS.
BE SURE CONCRETE
HAS BEEN ALLOWED
TO CURE FOR AT
LEAST 3 DAYS
Locate hardware needed to mount pole to anchor bolts. You
will need, eight flatwashers (#37), four lock washers (#36),
four hex nuts (#35) and four thread protectors (#34).
Put a flat washer (#37) on each anchor bolt. Lift post onto
anchor system and secure with one flatwasher (#37), one
lock washer (#36) and one hex nut (#35) for each anchor
8.
9.
10.
11.
12.
13.
Note:
be used for leveling system.
See Step 11.
Bottom nuts #35 can
bolt. Tighten Fasteners finger tight, leave loose enough to
level pole. Place a level on pole and adjust bottom nuts #35
until pole is level.
Tighten top four hex nuts #35 tight.
35
(Bottom Nut)
Note: Do not remove the nuts you installed in step 2 (pg. 5).
Содержание GOALRILLA CV B3303F
Страница 2: ...2 4L 8090 01...
Страница 15: ...15 2L 7218 01 1 12 12 12 45 44 Right Left 46 19 18 3 5 48 25 47 48 25 5 3 18 19 47 24 47 47 24...
Страница 16: ...16...