9.
Attach Post Ears (#30) to holes near the bottom of Top
Post (#3) using two hex bolts (#25) four washers (#18)
3
2
IMPORTANT! BE SURE CONCRETE HAS BEEN
ALLOWED TO CURE FOR AT LEAST 2 DAYS.
Figure 7
GOALIATH ASSEMBLY INSTRUCTIONS (Day 3)
10.
11.
12.
Place Pole Cap (#1) onto top of Top Pole (#3).
Note:
Pole
13.
Secure two stop spacers (#10) to pole, as shown in
Figure 8
,
using one hex bolt (#7) and one lock nut (#4). Tighten Lock
Figure 8
Detail 2
Slide tab on Actuator (#16) between Post Ears (#30) and
Secure using one bolt (#19), two washers (#20) and one
lock nut(#21). Tighten Lock Nut (#21) snug but
do not
Cap may be pre-installed by the factory.
Note: If necessary, use a rubber mallet to tap in
Pivot Tube (#14)
If not already pre-assembled, slide Plastic Actuator Sleeve (#15)
over Steel Actuator (#16) and place Actuator Cap (#13) on top.
Align holes in all 3 parts and slide Pivot Tube (#14) through holes
in Actuator Cap (#13), Plastic Actuator Sleeve (#15) and Steel
Actuator (#16) until equal amounts stick out through both sides of
actuator. See
Figure 8.
7
1
10
4
14
15
16
19
20
21
13
BA
CK
S
ID
E
BA
CK
SID
E
and two lock nuts (#4). Do not tighten nuts (#4)
completely until instructed to do so. See
Figure 7
&
Detail 2
.
nuts (#4) from Step 9.
over tighten. See
Figure 8
. At this time also
tighten
Nut (#4) but
do not over tighten.
10