c.
Thick
flat
washer
d.
Spacer
8.
Insert
a
rack-mounting
bolt
assembly
through
each
of
the
leveling
feet.
9.
Reposition
the
rack-mounting
plates
under
the
four
rack-mounting
bolts
so
that
the
mounting
bolts
are
centered
directly
over
the
threaded
bolt
holes.
10.
Turn
the
rack-mounting
bolts
four
complete
turns
into
the
mounting
plate’s
threaded
bolt
holes.
11.
Mark
the
raised-floor
panel
around
the
edges
of
front
and
back
rack-mounting
plates.
12.
Mark
the
plate
bolt-down
holes
that
are
accessible
through
the
opening
in
the
back
of
the
rack.
13.
Remove
the
rack-mounting
bolt
assemblies.
14.
If
you
are
installing
an
ac-powered
rack,
remove
the
bottom
isolator
bushing
from
each
of
the
leveling
feet.
15.
Remove
the
rack-mounting
plates
from
the
marked
locations.
16.
Loosen
each
of
the
locking
screws
on
the
casters.
17.
Move
the
rack
so
that
it
is
clear
of
both
areas
that
were
marked
on
the
floor
for
the
rack-mounting
plate
locations.
18.
Reposition
the
mounting
plates
within
the
marked
areas.
19.
Mark
the
raised-floor
panel
at
the
center
of
each
hole
in
the
rack-mounting
plates
(including
the
tapped
holes).
20.
Remove
the
two
rack-mounting
plates
from
the
marked
locations
on
the
raised
floor
panel.
21.
Drill
two
clearance
holes
on
each
end
of
each
rack-mounting
plate.
The
drilled
holes
should
be
approximately
1-inch
deep.
This
depth
will
accommodate
any
rack-mounting
bolt
extending
past
the
rack-mounting
plate
when
securing
the
rack
to
the
rack-mounting
plate.
22.
For
each
rack-mounting
plate,
select
at
least
two
suitable
hole
locations.
Select
the
hole
locations
as
close
to
the
threaded
hole
areas
as
possible.
Be
sure
the
hole
locations
selected
at
the
back
of
the
rack
are
accessible.
23.
Drill
pass-through
holes
in
the
raised-floor
panel.
The
pass-through
holes
allow
the
anchor
bolts
to
be
inserted
into
the
rack-mounting
plate
and
pass
through
the
raised
floor
panel
to
the
concrete
floor.
Note:
You
must
use
a
minimum
of
two
anchor
bolts
for
each
rack-mounting
plate
to
securely
attach
the
rack-mounting
plate
through
the
raised-floor
panel
to
the
concrete
floor.
Because
some
of
the
holes
in
each
rack-mounting
plate
may
align
with
concrete
reinforcement
rods
imbedded
in
the
concrete,
some
of
the
rack-mounting
plate
holes
may
not
be
usable.
24.
Transfer
the
locations
of
the
anchor
bolt
holes
(exclude
the
clearance
holes
drilled
for
the
rack-mounting
bolts
)
from
the
raised-floor
panel
to
the
concrete
floor
directly
beneath,
and
mark
the
hole
locations
on
the
concrete
floor.
25.
Drill
holes
in
the
concrete
floor
to
secure
the
anchor
bolts.
26.
Position
the
raised-floor
panel
back
into
position
over
the
anchor
bolt
holes.
27.
Position
the
front
stabilizer
bracket
within
the
marked
area
on
the
raised-floor
panel.
28.
Using
your
anchor
bolts,
secure
the
front
stabilizer
brackets
on
top
of
the
raised
floor
and
through
to
the
concrete
floor.
29.
Position
the
rear
stabilizer
brackets
within
the
marked
area
on
the
raised-floor
panel.
Chapter
2.
Installing
your
system
in
a
rack
25
Содержание PL160R
Страница 1: ...PL160T R PL260T T and PL460T R Installation Guide ESCALA REFERENCE 86 A1 55EW 01...
Страница 2: ......
Страница 10: ...viii Installation Guide for the 03E 4A 07M 15 and 08M 25...
Страница 12: ...2 Installation Guide for the 03E 4A 07M 15 and 08M 25...
Страница 14: ...4 Installation Guide for the 03E 4A 07M 15 and 08M 25...
Страница 54: ...44 Installation Guide for the 03E 4A 07M 15 and 08M 25...
Страница 96: ...86 Installation Guide for the 03E 4A 07M 15 and 08M 25...
Страница 98: ...88 Installation Guide for the 03E 4A 07M 15 and 08M 25...
Страница 105: ......
Страница 106: ...BULL CEDOC 357 AVENUE PATTON B P 20845 49008 ANGERS CEDEX 01 FRANCE REFERENCE 86 A1 55EW 01...