4. Pre-Installation
Prior to installation, manifold configuration must be determined as left or right handed.
5. Installation
5.1
Carefully remove from the packaging and check that all components are in place and that
nothing has been damaged during delivery.
5.2
The pump mixer is supplied for connection to the right-hand side of the manifold but can
be altered very simply for connection to the left-hand side. (See above)
5.3
To change orientation:
a) Remove swivel nut (7) from the TMV and move to opposite connection.
(These joints use o-ring seals and should not be overtightened)
b) Loosen the pump rotating nuts (5) on the elbow (6) and rotate through 180 degrees.
Re-tighten nut (5) after rotation.
5.4
Pipe connection orientation can be altered to suit using flow / return elbow (3) (supplied
loose) fitted in either flow or return.
5.5
A swivel joint is fitted to each side of the control group for connecting to the 1” F manifold
tappings.
Carefully offer up and screw the swivel joint threads evenly into the
manifold using a 37mm A/F spanner: the use of a 31mm A/F spanner will also ensure
that the connection to the pump mixer is kept tight. The joints use o-ring seals and care
should be taken not to over-tighten them.
5.6
Once connected, finish securing the manifold and large area mixer to the wall if not
already completed.
5.7
The primary flow and return pipework can now be connected to the 2 x 3/4” F connections.
The flow connection is at the H and the return connection is at the R. It is recommended
that ball valves are used to isolate this pipework where it is connected to the pump mixer.