![Esaote MyLab 9VET Скачать руководство пользователя страница 41](http://html.mh-extra.com/html/esaote/mylab-9vet/mylab-9vet_getting-started_2425214041.webp)
S Y S T E M O V E R V I E W
MyLab
- G E T T I N G S T A R T E D
3 - 7
GETTI
NG STARTED
Monitor (1)
MyLab
is equipped with an LCD LED flat-plan display on an articulated
mounting arm. The monitor is adjustable to accommodate different operating
positions and operator heights. The monitor can also be locked in position
for moving the system.
The monitor is suitable for reading medical images, in particular each
production unit is calibrated according to the Greyscale Standard Display
Function (GSDF) defined in Part 14 of the DICOM medical standard.
In addition, the entire apparatus, of which the monitor is an integral part,
complies with the mandatory standards of biomedical equipment (safety
according to IEC 60601-1 Ed. 3.1 and EMC according to IEC 60601-1-2 Ed.
4).
WARNING
The LCD must be considered an Information Technology (IT) device: it
can be safely used inside the patient area only when it is powered through
the cart insulation transformer.
On/Off Button (2)
The
O N /O FF
button is located beside the touchscreen, on the left side of the
control panel assembly, while the Main Switch (23) is located on the rear-
bottom of the system.
Beside the Main Switch is also located an earth terminal to be connected to
an external protective earthing system as additional protection.
When
MyLab
is connected to the mains and the Main Switch is on, the lighting
of the
O N /O FF
button changes to indicate its status. The different indicators
are described in the table below.
Table 3-3: On/Off button light
Pressing the
O N /O FF
button turns the system on or off, activating or closing
the examination session.
Led Colour
Meaning
GREEN
MyLab
is on
AMBER
MyLab
can be turned on
OFF
MyLab
can not be turned on. In this case check both
the rear main switch and the mains connection.
Содержание MyLab 9VET
Страница 1: ...Rev 05 February 2020 MyLab 9VET GETTING STARTED 350041300 ...
Страница 2: ......
Страница 5: ...MyLab G E T T I N G S T A R T E D v GETTING STARTED EC Declaration of Conformity ...
Страница 6: ...MyLab G E T T I N G S T A R T E D vi RED Declaration of Conformity ...
Страница 7: ...MyLab G E T T I N G S T A R T E D vii GETTING STARTED ...
Страница 8: ...MyLab G E T T I N G S T A R T E D viii ...
Страница 14: ...I N D E X MyLab G E T T I N G S T A R T E D xiv ...
Страница 34: ...A D D I T I O N A L I N F O R M A T I O N O N S A F E T Y MyLab G E T T I N G S T A R T E D 2 8 ...
Страница 46: ...S Y S T E M O V E R V I E W MyLab G E T T I N G S T A R T E D 3 12 ...
Страница 116: ...T E C H N I C A L S P E C I F I C A T I O N S MyLab G E T T I N G S T A R T E D 9 12 ...