![ESAB ESP-50 Скачать руководство пользователя страница 40](http://html1.mh-extra.com/html/esab/esp-50/esp-50_instruction-manual_2425001040.webp)
40
6.4
SEQuENCE of oPEraTIoN
NoTES:
1.
When the start signal is turned "on" during postflow period, the postflow and preflow times are canceled.
.
When the amber fault light comes on, cutting operation should be stopped. The postflow time starts from the moment
the start signal is removed.
10 SEC
.5 SEC.
START SIGNAL
GAS SOLENOID VALVE
OPEN
CLOSE
PREFLOW
OFF
ON
FAULT OVERLOAD LIGHT
INVERTER
CUTTING ARC (CURRENT)
POSTFLOW
SECTIoN 6
TrouBlESHooTINg
NOTE:
Schematics and Wiring Diagrams on 11” x 17”
paper are included
inside the back cover of this manual.
Содержание ESP-50
Страница 4: ...TABLE OF CONTENTS...
Страница 32: ...32 section 4 operation...
Страница 53: ...53 section 7 replacement parts...
Страница 54: ...54 notes...
Страница 57: ......
Страница 58: ......
Страница 59: ......
Страница 60: ......
Страница 61: ......
Страница 62: ......