Installation Manual
INSTALLING AND PROGRAMMING
1
TOOLS AND MATERIALS REQUIRED
•
Set of screwdrivers
•
Electrician's scissors
•
Marker pencil
•
Drill and broaches
•
Electrical cables
2
INITIAL CONDITIONS AND CHECKS
Initial installation conditions
n
Ensure the operator is correctly installed in the
shutter gate.
n
A 230Vac / 50Hz (CLEVER01) or 125Vac / 60Hz
(CLEVER01M) power connection is required.
Environmental conditions
n
This device is not suitable for installation in
inflammable or explosive environments.
n
Check that the admissible environmental
temperature range for the control panel is
suitable for the location.
Electrical power supply installation
n
Ensure the direct current connection and
installation fulfil the following requirements:
• The nominal voltage of the installation must
coincide with that of the control panel.
• The installation must be able to support the
power consumed by all the automatic key
devices.
• The installation must be earthed.
• The electrical installation must comply with
low voltage regulations.
• The installation elements must be properly
secured and in a good state of conservation.
• The direct connection point must be high enough
to be out of the reach of children.
n
If the electrical installation does not comply
with the foregoing requirements, repair before
installing the automatic key device.
3
CONTENT
1
Open the package and remove the contents from
within.
}
Discard the packaging in an environmentally
friendly manner, using recycling containers.
n
Do not leave the packaging within the reach
of children or handicapped people, as it may
cause injury.
2
Check the content: control panel with box and
instructions manual.
)
Should it be noticed that a piece is missing or
deteriorated, contact the nearest technical service.
!"##$
CLEVER01_CM4_EN.book Page 24 Wednesday, May 18, 2011 12:52 PM