![ERKO SH400PLC Скачать руководство пользователя страница 26](http://html.mh-extra.com/html/erko/sh400plc/sh400plc_operation-manual_2423765026.webp)
# VSH400PLC090909
- 25 -
The basic elements of the generator include: a V1 arranged pump set (pump and
engine submerged in oil), pumping-return filter, socket distributor. The tank is
equipped with support structure for fixing. The hydraulic system of the generator
ends with G1/4 outlets. The power unit is equipped with a cylindrical oil level
gauge.
10.4 OPERATION AND MAINTENANCE
Before starting work please check the oil level. The indicator should indicate
the required oil level which is maximum 15 mm free space at the top of the
glass pipe. The maximum level should be 5 mm from the upper limit of the
glass pipe.
After the end of work, switch off the electrical supply with the “Main switch”
Q1 and disconnect the supply of the entire equipment.
Switch off the electrical power supply when carrying out any maintenance
work, the hydraulic system should be unloaded.
The supply generates high pressures. Any pressure leak may result in
unexpected consequences. Take special precautions when operating the
equipment.
Upon releasing the seals the operator loses the guarantee for the entire
hydraulic system.
The maximum working pressure was set by the manufacturer at the overflow
valve at 630 bar and is not subject to adjusting throughout the operation
period (sealed).
Particular attention should be paid to possible oil leaks. If any, remove them
immediately.
The oil should be changed every 12 months. Oils should be in conformity
with DIN 51524 part 1 to 4, class HLP or ISO 6743/4 class HM, of the
viscosity ISO VG 22,32.
Hydrol
®
L-HM 22 is recommended.
1.
Pumping module HC-31
-1 set
2.
Safety valve A2/700 ( 630 bar)
-1 item
3.
Distributor (electric valve) VB01FM-H-1-G24
-3 items