7.1
Locate the Flag Assembly previously assembled to upper
bracket #SB-S003. Place the assembly with upper bracket
onto the upper tube as shown, the rounded edge of the flag
assembly should be facing down and to the outside of the
mailbox as shown.
(Figure 7.1)
7.1
Next place two ¼ - 20 X 3 inch bolts #SB-F007 through the
upper bracket and top tube #SB-S006. It is easiest to place
the top bolt in first then the lower bolt.
(Figure 7.2)
7.1
Place two ¼ - 20 Nylon top locknuts #SB-F008 onto the bolts
and tighten securely. The flag assembly should be located in
front of the largest portion of the mailbox.
(Figure 7.3)
8.1
Last, locate the plastic tube end cap #SB-S007 and place
it into the top tube end above the upper bracket to keep
water out of the tube assembly. Tap this in place with a
hammer if necessary. Use a small block of wood on top of
end cap before hammering to protect end cap.
Step 7 Fasteners used
• 2 Bolts #SB-F007
• 2 Nylon Top Locknuts #SB-F008
Step 7 Tools needed
• Socket Wrench Set
• Adjustable Wrench
Step 7 Assemble Flag to Upper Mount Tube
Step 8 Finish Assembly
#SB-F007
#SB-F008
Figure 7.1
Figure 8.1
Figure 7.2
#SB-S003
#SB-S007
#SB-S006
Figure 7.3
- 7 -