background image

 7.1 

 Locate the Flag Assembly previously assembled to upper 

bracket #SB-S003. Place the assembly with upper bracket 

onto the upper tube as shown, the rounded edge of the  flag 

assembly should be facing down and to the outside of the 

mailbox as shown.  

(Figure 7.1)

 7.1 

 Next place two ¼ - 20 X 3 inch bolts #SB-F007 through the 

upper bracket and top tube #SB-S006. It is easiest to place 

the top bolt in first then the lower bolt.  

(Figure 7.2)

 7.1 

 Place two ¼ - 20 Nylon top locknuts #SB-F008 onto the bolts 

and tighten securely. The flag assembly should be located in 

front of the largest portion of the mailbox. 

(Figure 7.3)

 8.1 

 Last, locate the plastic tube end cap #SB-S007 and place  

it into the top tube end above the upper bracket to keep  

water out of the tube assembly. Tap this in place with a  

hammer if necessary. Use a small block of wood on top of 

end cap before hammering to protect end cap.

Step 7 Fasteners used

• 2 Bolts #SB-F007 

• 2 Nylon Top Locknuts #SB-F008
Step 7 Tools needed

• Socket Wrench Set 

• Adjustable Wrench 

Step 7  Assemble Flag to Upper Mount Tube  

Step 8  Finish Assembly

#SB-F007

#SB-F008

Figure 7.1

Figure 8.1

Figure 7.2

#SB-S003

#SB-S007

#SB-S006

Figure 7.3

- 7 -

Содержание SlopBuster

Страница 1: ...System can be mounted directly to base of 4 x 4 wood post DECORATIVE MAILBOX Remote 4 x 4 wood post needs to be installed for mounting of SlopBuster Protection System Special Remote Installation Acce...

Страница 2: ...rew heads must be on bracket side and the nuts on flag side to allow for tube clearance Step 1 Assemble Top Bracket Step 1 Fasteners used Truss Head Screws SB F001 Nylon Top Locking Nuts SB F002 Step...

Страница 3: ...e square holes if you choose to through bolt the bracket to your mailbox post with carriage bolts not supplied instead of the lag bolts supplied This can be done for the most rugged installation if re...

Страница 4: ...so consideration must be taken when positioning the lower bracket so that the lower bracket will fasten securely to the post 4 3 Remove the scrap plastic piece and position the lower bracket through t...

Страница 5: ...8 inch bolt securely as well making sure that the lower tube is aligned in a straight vertical position with the mailbox post Figure 5 2 Step 5 Fasteners used Top Bolt SB F009 Bottom Bolt SB F007 Nylo...

Страница 6: ...e upper tube bend is facing the mailbox as shown in a vertical plane Figure 6 1 6 3 Next place one 3 8 16 X 3 bolt SB F009 through the upper and lower tubes Use a 3 8 Nylon head locknut SB F010 and se...

Страница 7: ...o the bolts and tighten securely The flag assembly should be located in front of the largest portion of the mailbox Figure 7 3 8 1 Last locate the plastic tube end cap SB S007 and place it into the to...

Страница 8: ...st is firmly in place a second piece of 4 x 4 wood post is placed into top of Support Tube Accessory The post should be long enough so when lower mounting bracket is installed on the post the measurem...

Отзывы: