Erie Products SlopBuster Скачать руководство пользователя страница 6

 6.1 

 Upper tube mount. Locate upper tube #SB-S006, hold the 

upper tube with the expanded end pointed down, this end 

will slide over the lower tube.  

(Figure 6.1)

 6.2 

 With the upper tube mounting hole aligned with the lower 

tube mounting hole located on the sides of the tubes place 

the upper tube over the lower tube. NOTE: make sure that 

the upper tube bend is facing the mailbox as shown in a  

vertical plane.  

(Figure 6.1)

 6.3 

 Next place one 3/8 – 16 X 3 ¼ bolt #SB-F009 through the  

upper and lower tubes. Use a 3/8 Nylon head locknut  

#SB-F010 and secure tightly, again making sure that the  

tube assembly is vertical straight and the upper tube bend  

is facing the mailbox. 

(Figure 6.2)

Step 6 Fasteners used

• Bolt #SB-F007 

• Nylon Top Locknut #SB-F008
Step 6 Tools needed

• Socket Wrench Set 

• Adjustable Wrench 

Step 6  Assemble Upper Mount Tube  

#SB-F009

#SB-F010

Figure 6.1

Figure 6.2

#SB-S006

- 6 -

Содержание SlopBuster

Страница 1: ...System can be mounted directly to base of 4 x 4 wood post DECORATIVE MAILBOX Remote 4 x 4 wood post needs to be installed for mounting of SlopBuster Protection System Special Remote Installation Acce...

Страница 2: ...rew heads must be on bracket side and the nuts on flag side to allow for tube clearance Step 1 Assemble Top Bracket Step 1 Fasteners used Truss Head Screws SB F001 Nylon Top Locking Nuts SB F002 Step...

Страница 3: ...e square holes if you choose to through bolt the bracket to your mailbox post with carriage bolts not supplied instead of the lag bolts supplied This can be done for the most rugged installation if re...

Страница 4: ...so consideration must be taken when positioning the lower bracket so that the lower bracket will fasten securely to the post 4 3 Remove the scrap plastic piece and position the lower bracket through t...

Страница 5: ...8 inch bolt securely as well making sure that the lower tube is aligned in a straight vertical position with the mailbox post Figure 5 2 Step 5 Fasteners used Top Bolt SB F009 Bottom Bolt SB F007 Nylo...

Страница 6: ...e upper tube bend is facing the mailbox as shown in a vertical plane Figure 6 1 6 3 Next place one 3 8 16 X 3 bolt SB F009 through the upper and lower tubes Use a 3 8 Nylon head locknut SB F010 and se...

Страница 7: ...o the bolts and tighten securely The flag assembly should be located in front of the largest portion of the mailbox Figure 7 3 8 1 Last locate the plastic tube end cap SB S007 and place it into the to...

Страница 8: ...st is firmly in place a second piece of 4 x 4 wood post is placed into top of Support Tube Accessory The post should be long enough so when lower mounting bracket is installed on the post the measurem...

Отзывы: