background image

 5.1 

 Locate lower tube #SB-S005 and place it into lower bracket 

#SB-S004. There is one 3/8 inch hole and one ¼ inch hole in 

the lower tube. 

 5.1 

 Locate these two holes on the lower bracket and put the top 

3/8 -16 X 3 ¼ bolt #SB-F009 through the lower bracket and 

lower tube.  

(Figure 5.1)

 5.1 

 Place a 3/8 – 16 Nylon top locknut #SB-F010 onto the bolt 

(finger tighten)

 5.1 

 Next put the ¼ - 20 X 3 bolt #SB-F007 through the lower 

bracket and lower tube. 

 5.1 

 Place a ¼ - 20 Nylon top locknut #SB-F008 onto the bolt 

and tighten securely, go back and tighten the 3/8 inch bolt 

securely as well, making sure that the lower tube is aligned 

in a straight vertical position with the mailbox post.   

(Figure 5.2)

Step 5 Fasteners used

• Top Bolt #SB-F009 

• Bottom Bolt #SB-F007 

• Nylon Top Locknut #SB-F010 

• Nylon Bottom Locknut #SB-F008
Step 5 Tools needed

• Socket Wrench Set 

• Adjustable Wrench 

Step 5  Assemble Lower Mount Tube  

Figure 5.1

Figure 5.2

#SB-F007

#SB-F009

#SB-F008

#SB-F010

#SB-S005

NOTE: The two bolts mounting the lower tube are different sizes. The 

SlopBuster

 is designed so that the bottom, smaller bolt will shear off 

and allow the SlopBuster

 to pivot on the upper bolt if a vehicle hits 

the mailbox. City, Township, County, State and Federal laws mandate 

that rural mailboxes must be of a break away nature.

- 5 -

Содержание SlopBuster

Страница 1: ...System can be mounted directly to base of 4 x 4 wood post DECORATIVE MAILBOX Remote 4 x 4 wood post needs to be installed for mounting of SlopBuster Protection System Special Remote Installation Acce...

Страница 2: ...rew heads must be on bracket side and the nuts on flag side to allow for tube clearance Step 1 Assemble Top Bracket Step 1 Fasteners used Truss Head Screws SB F001 Nylon Top Locking Nuts SB F002 Step...

Страница 3: ...e square holes if you choose to through bolt the bracket to your mailbox post with carriage bolts not supplied instead of the lag bolts supplied This can be done for the most rugged installation if re...

Страница 4: ...so consideration must be taken when positioning the lower bracket so that the lower bracket will fasten securely to the post 4 3 Remove the scrap plastic piece and position the lower bracket through t...

Страница 5: ...8 inch bolt securely as well making sure that the lower tube is aligned in a straight vertical position with the mailbox post Figure 5 2 Step 5 Fasteners used Top Bolt SB F009 Bottom Bolt SB F007 Nylo...

Страница 6: ...e upper tube bend is facing the mailbox as shown in a vertical plane Figure 6 1 6 3 Next place one 3 8 16 X 3 bolt SB F009 through the upper and lower tubes Use a 3 8 Nylon head locknut SB F010 and se...

Страница 7: ...o the bolts and tighten securely The flag assembly should be located in front of the largest portion of the mailbox Figure 7 3 8 1 Last locate the plastic tube end cap SB S007 and place it into the to...

Страница 8: ...st is firmly in place a second piece of 4 x 4 wood post is placed into top of Support Tube Accessory The post should be long enough so when lower mounting bracket is installed on the post the measurem...

Отзывы: