
Installation Procedure
Table 2
Objects to Be Recycled or Disposed of After RBS Installation
Item
Sort or Recycle?
Cable insulation from
crimping, brazing or
welding
Packing chips
Foam
Polystyrene
Bubble plastic
Cable tie clippings
Sorted with plastics
Paper and wood
Paper recycling
Waste metal from cable
ladders
Pieces of cable
Nuts, bolts, washers and
screws
Recycled or sorted as metals
Note:
All packing material must be recycled, and shock absorbers disposed
of, in accordance with local recycling regulations.
4.8.1
Updating the Site Installation Documentation
1.
Check the
Site Installation Documentation
for deviations from the
installation.
2.
Update the documents with the changes that apply.
3.
Send the documents to the person responsible for Site Installation
Engineering.
4.8.2
Performing Final Checks
Before leaving the site, make sure that the following tasks have been completed:
Table 3
Checklist
Check the following:
OK
1.
All cables are properly routed and connected.
3.
The site is clear of waste materials.
4.
The Site Installation Documentation is updated.
11
41/1531-LZA 701 0001 Uen D 2008-04-23