
RBS Installation Instructions
2. Loosen the captive screws on
both sides to release the front
cover, using a hand or a Torx 10
screwdriver.
3. Align the upper edge of the new
front cover with the two marks on the
rear cover, and slide the cover up all
the way. Tighten the captive screws
fingertight or tighten them properly
using a Torx 10 screwdriver.
4.7
Testing the Installation
The RBS is now ready for verification of the site installation.
The verification must be performed directly after the completion of the RBS
installation, see document
Verifying RBS Installations at Site
.
After the installation and integration testing is completed, perform concluding
routines as described below.
4.8
Performing Concluding Routines
This section describes the routines to be completed before leaving the site.
Note:
Ericsson strongly advises that when cleaning up after installing the
RBS, the personnel performing the installation pay particular attention
to the environment. Primarily, recycle all waste materials that can be
recycled and sort waste so that it can be disposed of according to local
regulations.
10
41/1531-LZA 701 0001 Uen D 2008-04-23