Ericsson RBS 2409 Скачать руководство пользователя страница 14

RBS Installation Instructions

2. Loosen the captive screws on

both sides to release the front
cover, using a hand or a Torx 10
screwdriver.

3. Align the upper edge of the new

front cover with the two marks on the
rear cover, and slide the cover up all
the way. Tighten the captive screws
fingertight or tighten them properly
using a Torx 10 screwdriver.

4.7

Testing the Installation

The RBS is now ready for verification of the site installation.

The verification must be performed directly after the completion of the RBS
installation, see document

Verifying RBS Installations at Site

.

After the installation and integration testing is completed, perform concluding
routines as described below.

4.8

Performing Concluding Routines

This section describes the routines to be completed before leaving the site.

Note:

Ericsson strongly advises that when cleaning up after installing the

RBS, the personnel performing the installation pay particular attention
to the environment. Primarily, recycle all waste materials that can be
recycled and sort waste so that it can be disposed of according to local
regulations.

10

41/1531-LZA 701 0001 Uen D 2008-04-23

Содержание RBS 2409

Страница 1: ...RBS Installation Instructions RBS 2409 INSTALLATION INSTRUCTION...

Страница 2: ...t the written permission of the copyright owner The contents of this document are subject to revision without notice due to continued progress in methodology design and manufacturing Ericsson shall ha...

Страница 3: ...1 Tools for Installation 3 4 Installation Procedure 3 4 1 Unpacking RBS 4 4 2 Installing the RBS 4 4 3 Attaching the RBS 6 4 4 Installing DC power 8 4 5 Connecting Cables 8 4 6 Replacing Front Cover 9...

Страница 4: ...RBS Installation Instructions 41 1531 LZA 701 0001 Uen D 2008 04 23...

Страница 5: ...work correctly 1 1 Revision Information Other than editorial changes this document has been revised as follows Information about chapter Preconditions updated 2 Preconditions This section provides pre...

Страница 6: ...ditional Preconditions for Wall or Ceiling Mounted RBS Before installing the RBS ensure that the following preconditions are met The type of fasteners are suitable for the kind of material on which th...

Страница 7: ...on of the RBS 3 1 Tools for Installation Table 1 Basic Tools for Installation Description Specification Drilling machine Screwdriver Torx T10 Knife Screws for installation 4 screws for plate and 2 scr...

Страница 8: ...g RBS Unpack the RBS on site To avoid damage the RBS must not be unpacked elsewhere and then transported to site Ensure that the correct material has been delivered If the material is damaged then com...

Страница 9: ...necessary to drill holes for the screws 4 2 2 Installing the Wall Plate on a Ceiling Bracket Optional 1 Place the ceiling bracket in the position where the RBS is to be located 2 Mark the position of...

Страница 10: ...and secure it P018103A 4 3 Attaching the RBS 1 Insert and press a screwdriver in the upper hole to release the front cover and slide the cover down 75 mm 2 Detach the cable cover without releasing th...

Страница 11: ...allation Procedure 3 Attach the RBS in its position and press it down Make sure the hole on the bracket and the hole on the RBS are aligned see 2 in figure to right 7 41 1531 LZA 701 0001 Uen D 2008 0...

Страница 12: ...the RBS 2409 are available Ethernet transmission DC power External Antenna optional Y link if using extension RBS Configuration Configuring the RBS or the STN 1 Connect the OMT cable to the configurat...

Страница 13: ...the cable cover 3 Close the front cover by sliding it up until there is a clicking sound 4 6 Replacing Front Cover 1 Insert and press a screwdriver in the upper hole to release the front cover and sli...

Страница 14: ...formed directly after the completion of the RBS installation see document Verifying RBS Installations at Site After the installation and integration testing is completed perform concluding routines as...

Страница 15: ...disposed of in accordance with local recycling regulations 4 8 1 Updating the Site Installation Documentation 1 Check the Site Installation Documentation for deviations from the installation 2 Update...

Страница 16: ...n has been handed over to the person responsible for the site 6 The RBS is powered up if the surrounding temperature changes between hot and cold and the RBS installation is not completed within 48 ho...

Отзывы: