M
ANUAL
_
EPT-4220AP
ERAE ELECTRONICS
65
7-2
Test Condition
Before function test and alignment, each PDP TV should be run-in and warned-up for at
least 2 hours with the following conditions:
a). In room temperature
b). With full-white screen
c). With cycled display modes,
RESOLUTION
H-Freq(KHz)
V-Freq(Hz)
31.47
60
37.86
72
640*480
37.50
75
720*400
31.47
70
35.15
56
37.88
60
48.88
72
800*600
46.88
75
48.36
60
56.48
70
1024*768
60.02
75
7-3
Test Display Modes and Pattern
Содержание EPT4220AP
Страница 11: ...MANUAL _ EPT 4220AP ERAE ELECTRONICS 11 2 1 Package Overview...
Страница 13: ...MANUAL _ EPT 4220AP ERAE ELECTRONICS 13 2 2 Exploded Overview 2 2 1 PDP SET OVER VIEW...
Страница 14: ...SERVICE 14 2 2 2 PDP MODULE OVERVIEW...
Страница 19: ...MANUAL _ EPT 4220AP ERAE ELECTRONICS 19 9 VSC BOARD ASSY 10 Tuner B D Assy...
Страница 22: ...SERVICE 22 3 Unscrew 19 m screws of BACK COVER 4 Unscrew 7 m screws 6 t screws 1 nut COVER JACK...
Страница 41: ...MANUAL _ EPT 4220AP ERAE ELECTRONICS 41 4 7 Power Board 4 7 1 The Location of Connector and Specification...
Страница 75: ...MANUAL _ EPT 4220AP ERAE ELECTRONICS 75 5 Click Flash to upgrade program...