Step 10

: Insert the Center Support Bar (o) into the upper top groove on the back of the frame with the bottom end 

near the approximate center point of the frame and rotate it in at an angle so that both ends of the bar are in alignment 

with the groove. 

 

Installation 

Step 11

Measure the overall length and height of the frame and drill holes for the top brackets. Line up the wall 

brackets with the drilled holes on the installation location and screw  them in using a Phillips screwdriver. If not 

installing  into  a  structural  wood  stud,  use  a  hollow  wall  anchor  then  screw  in  the  M5x50  wood  screws  with  a 

screwdriver. Make sure the brackets are leveled. 

Diagonal Sizes of 150” and below use 4 x wall brackets 

 

 

 

 

 

 

 

 

 

Diagonal Models 150” and below use 1 x 

Center Support Bar 

Diagonal Models above 150” require 2 x 

Center Support Bars 

 
 
 
 
 
 

 

Model/Size 

X = Wall bracket distance 

X1 = Bracket hole distance 

Y = Top/Bottom Wall Bracket Height 

110” 

1280mm (50.39”) 

30mm (1.18”) 

1410mm (55.51”) 

120” 

1390mm (54.72”) 

30mm (1.18”) 

1530mm (60.24”) 

135” 

1550mm (61.02”) 

30mm (1.18”) 

1720mm (67.72”) 

150” 

1720mm (67.72”) 

30mm (1.18”) 

1900mm (74.80”) 

138” 

1600mm (63”) 

30mm (1.18”) 

1410mm (55.51”) 

Don’t tighten the screw to allow 
the screen to move up and down 

j. 

k. 

Place a center 

support bar 30 cm 

(11.8”) apart from 

the center (red line).  

 

Содержание Prime Vision ISF Series

Страница 1: ...en Correct usage and maintenance will ensure a long product life In order for the ChromaWhite to maintain its projection qualities and optimum performance please refer to the list below for proper mai...

Страница 2: ...tion 2 2 2 2 2 2 b Center Joints D5 top position 2 2 2 2 2 2 c Elbow Joints M4 bottom position 4 4 4 4 4 4 d Elbow Joints D5 top position 4 4 4 4 4 4 g M4x7 Screws 24 24 24 24 24 24 h Spring 66 72 80...

Страница 3: ...ntal frame B C and secure with the M4x7 screws g as shown in the illustration below Step 4 Connect the elbow joints c d to the top and bottom sections of the vertical frame Once inserted connect the v...

Страница 4: ...fully unroll the screen material on a clean surface from the roller to the other side as shown below The back side of the screen material should be placed upwards Step7 Carefully place the screen on t...

Страница 5: ...a firm grasp in the middle areas How to attach the springs Step 9 Hook one end of the spring and secure inside the groove of the frame use the spring hook i to attach the spring to the hole located o...

Страница 6: ...21 6 First connect on four corners steps 1 4 make sure all four corners are fixed before proceeding with next spring Continue to attach the remaining springs to the material in steps 5 12 in the follo...

Страница 7: ...into a structural wood stud use a hollow wall anchor then screw in the M5x50 wood screws with a screwdriver Make sure the brackets are leveled Diagonal Sizes of 150 and below use 4 x wall brackets Di...

Страница 8: ...hown below and push down at the center of the top of the frame fig 2 to secure For Technical Support or an EPV Screens contact in your area visit www epvscreens com Model Size X Wall bracket distance...

Отзывы: