05232022JA
U-00221
3
Frame Assembly
Step 1:
Place the EPE sponge (foam) sheet on the ground of the area where the screen will be assembled.
Step 2:
Position the pieces of the frame on the EPE sponge in the arrangement shown below.
Step 3:
Insert
center joint
(a/b) connectors into
one-half of the horizontal frame
(B/C) and secure with the
M4x7
screws
(g) as shown in the illustration below.
Step 4:
Connect the
elbow joints (c/d)
to the top and bottom sections of the vertical frame. Once inserted, connect
the vertical sections to the horizontal frame sections. Make sure all holes are in alignment and the frame pieces are
flush (no gaps). They should form perfect right angles.
8.
a.
b.
d.
c.
Tip: The center joint (b) with the larger diameter holes should be on top.
Tip: The elbow joint (d)with the larger diameter holes should be on top.