background image

12282021JA 

www.epvscreens.com

 

 

Step  13: 

After attaching the entire black backing to the frame with the velcro, use the 

spring  hook (d)

 to 

attach  the 

spring  (e)

  to  the  hole  located  on  the  screen  material’s  outer  edge  in  the  following  order.   

Make sure the spring hook goes over the rod

 
Attach the four corners first (1).  
 
 
 
 
 
 
 
 
 
After those are secure, attach the vertical portions of the material, begin in the center, and move towards the 
corners (2).  Lastly,  attach the horizontal sections of the material by connecting the center of the material 
and make your way towards the corners (3). 
 

Note (after all springs have been attached): 
Correct  material  installation

  –Corners  of  the  screen  material  are  properly  wrapped  around  the  corner 

edges of the frame and material is evenly tensioned and flat, creating a nicely taut surface. 

 
Incorrect  material  installation

  –The  corners  of  the  screen  material  are  not  properly  wrapped  along  the 

edge  of  the  frame  leaving  the  material  with  unbalanced  tension  and  an  uneven  finish.  To  correct,  detach 
springs from material at the corner(s) where material does not lie flat along the edge of the frame, reposition 
the material so that it lies flat and wraps along the edge of the frame, and reattach springs to the material. 
 
 
 
 
 
 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Center Support Bar 

 
 
 

1

 

1

 

1

 

2

 

3

 

2

 

3

 

To avoid ripples forming in the material it is imperative that all of the corners are properly wrappedaround the 
edges as illustrated in the check mark diagrams. 

 

Attach springs to holes 

Repeat on all corners 

Содержание EDGE FREE AcousticPro 4K eFinity Series

Страница 1: ...a sound transparent moir free front projection material designed for 4K 8K Ultra HD projectors for environments with controlled lighting For optimum projection performance please refer to the list be...

Страница 2: ...8 8 8 c M4x6 Screws 60 60 60 60 60 d Spring Hook 2 2 2 2 2 e Spring preloaded 52 56 64 68 76 f Top wall brackets 2 2 2 2 2 g M5x50 Wall Screws 6 6 6 6 6 h Hollow Wall anchors 6 6 6 6 6 i Bottom wall b...

Страница 3: ...b c and secure with the M4x6 screws c Step 5 Connect the elbow joints b to the top and bottom sections of the vertical frame Once inserted connect the vertical sections of the horizontal frame sectio...

Страница 4: ...on the white gloves m and carefully unroll the screen material on a clean surface from the roller to the other side as shown below The back side of the screen material should be placed upwards Step 9...

Страница 5: ...le edge of the frame to come in direct contact with the screen material to avoid puncturing it Note Make sure all the corners of the frame are aligned according to the markings on the back of the mate...

Страница 6: ...tion Corners of the screen material are properly wrapped around the corner edges of the frame and material is evenly tensioned and flat creating a nicely taut surface Incorrect material installation T...

Страница 7: ...n alignment with the groove Diagonal Models 150 and below use 1 x Center Support Bar Diagonal Models above 150 require 2 x Center Support Bars Attention Do not proceed with the Edge Trim installation...

Страница 8: ...location and screw them in using a Phillips screwdriver If not installing into a structural wood stud use a hollow wall anchor then screw in the M5x50 wood screws with a screwdriver Make sure the brac...

Отзывы: