12282021JA
3
Frame Assembly
Step 1
: Place the soft foam sheet on a
clean area on the ground where the
screen will be assembled.
Step 2:
Position the pieces of the frame
on the foam sheet in the arrangement
Step 3
: Remove the foam in all frame ends before assembling the frame
Step 4:
Insert the
center joint (a)
connectors into
one-half of the horizontal frame (b/c)
and secure with the
M4x6 screws (c)
.
Step 5:
Connect the
elbow joints (b)
to the top and bottom sections of the vertical frame. Once inserted,
connect the vertical sections of the horizontal frame sections. Make sure all holes are in alignment and the
frame pieces are flush (no gaps). They should form perfect right angles.
Step 6
: Secure the elbow joints by fastening them with
M4x6 screws (c)
, 4 at each corner.
2. Hardware Parts List
a.
b.
c.
d.
e.
f.
g.
h.
i
j.
k.
l.
m.
Remove the foam
Note:
Springs are preloaded inside the frame’s grooves.
Please make sure to avoid the springs from falling out
when removing the foam.
Foam sheet
Foam sheet