5-32
Disassembly, Assembly, and Adjustment
Rev. A
C o n fid e n tia l
Main Assembly 16
Ribbon frame assembly, ribbon frame spring, and ribbon frame fixing plate
1. Apply G-31 to the switching point of the ribbon frame on the ribbon switch lever. (A line of
lubrication: length 4 mm x wide 1 mm)
2. Apply G-31 to the tip of release point of the ribbon frame assembly on the base frame
assembly. (A point of lubrication: diameter 1 mm)
3. Apply G-31 to the each ribbon frame assembly mounting shaft (left and right) in the base
frame assembly. (A line of lubrication: length 2 mm x wide 1 mm)
4. Attach the shaft (A) and (B) of the base frame assembly to the ribbon frame assembly.
5. Attach the ribbon frame fixing plate into the groove in the right ribbon frame assembly
mounting shaft (A).
6. Hook the ribbon frame spring to (C) of the base frame assembly and (D) of the ribbon frame
assembly.
Ribbon frame fixing plate
Ribbon frame assembly
Ribbon frame spring
Apply G-31
(D)
(C)
Apply G-31
(A)
Apply G-31
Base frame assembly
(B)
Содержание TM-U200 Series
Страница 1: ...Confidential Technical manual TM U200 Series Type A AM English 400950100 Copied Date 199 Copied by ...
Страница 6: ...iv Confidential Revision Sheet Revision Page Altered Items and Contents Rev A ...
Страница 72: ...2 30 Mechanism Configuration and Operating Principles Rev A Confidential ...
Страница 172: ...6 Appendix Rev A Confidential Main Circuit Board Parts Layout ...
Страница 176: ...10 Appendix Rev A Confidential ...
Страница 186: ...Rev A Appendix A 20 TM U200 Series Type A AM Technical Manual Confidential ...
Страница 187: ...Confidential SEIKO EPSON CORPORATION Printed in Japan ...