![Epson LS10-B Скачать руководство пользователя страница 155](http://html.mh-extra.com/html/epson/ls10-b/ls10-b_user-manual_110798155.webp)
Maintenance 10. Ball Screw Spline Unit
LS10-B Rev.6
143
Ball Screw
Spline Unit
Installation
(1) Insert a new ball screw spline unit in the Arm #2.
(2) Secure the spline nut from the bottom side of
the Arm #2.
4-M5×15
(3) Mount the following.
Joint #3 motor unit / Joint #4 motor unit / Joint #4 intermediate pulley /
U1 belt / U2 belt / Z belt
Follow the U2 belt installation steps in
Maintenance: 8.2 Replacing the Timing Belt
.
(4) Mount the Arm Top Cover and Arm Bottom Cover.
For details, refer to
Maintenance: 3. Covers
.
(5) Grease the shaft.
For details, refer to
Maintenance: 10.1 Greasing the Ball Screw Spline Unit
.
(6) For the Cleanroom-model, mount the bellows.
For details, refer to
Maintenance: 9. Bellows
.
(7) Mount the end effector, cables, and tubes.
(8) Perform the calibration of Joints #3, #4.
For details, refer to
Maintenance: 13. Calibration
.
Содержание LS10-B
Страница 1: ...Rev 6 EM204R4257F SCARA ROBOT LS10 B series MANIPULATOR MANUAL ...
Страница 2: ...MANIPULATOR MANUAL LS10 B series Rev 6 ...
Страница 8: ...vi LS10 B Rev 6 ...
Страница 12: ...TABLE OF CONTENTS x LS10 B Rev 6 ...
Страница 14: ......
Страница 25: ...Setup Operation 1 Safety LS10 B Rev 6 13 LS10 B Figure LS10 B702S ...
Страница 65: ...Setup Operation 5 Motion Range LS10 B Rev 6 53 Standard model LS10 B S ...
Страница 66: ...Setup Operation 5 Motion Range 54 LS10 B Rev 6 Cleanroom model LS10 B C ...
Страница 67: ...Maintenance This volume contains maintenance procedures with safety precautions for LS10 B series Manipulators ...
Страница 68: ......
Страница 89: ...Maintenance 4 Cable LS10 B Rev 6 77 4 2 Wiring Diagrams 4 2 1 Signal Cable ...
Страница 90: ...Maintenance 4 Cable 78 LS10 B Rev 6 4 2 2 Power Cable ...