Stand 02.01.09, GB 32, Geared head drill
Page 17 of 54
1.10 Safety during general maintenance work
Before you begin with maintenance work at the machine you are bound to inform
the operating personnel.
Announce and document changes which are safety relevant. Do not execute
changes without consultation with the manufacturer. Refresh the operation
manual only in consultation with the manufacturer. Only instruct the operation
personnel if all changes are approved.
Document the instruction in an adequate way.
1.10.1
Breaking and assuring the machine
Deactivate the machine before the beginning of attendance and maintenance
work with the main switch. Assure the main switch with a u
– lock and retain the
key. If applicable brew the mains plug.
Mark and assure the machine clearly against unauthorised resetting.
After unplug of the mains plug all dangerous tensions are disabled.
Excluded are areas at the machine that are marked with the adjoining symbol. At
these areas dangerous tensions can be possible although a deactivated main
switch (f. e. connecting line).
Warning!
Moves of machine parts and electric machine parts can hurt you and
others heavy. Act very careful if it is not necessary to unplug the
machine because of working. Inform personnel around you about your
cycle and the possible dangers.
1.10.2
Use of hoisting devices for attendance work
Warning!
If the lifting tool is not stable enough it can burst what may cause heavy
or deadly injuries.
Check before working with lifting tool whether it is admitted for the load
and undamaged. Assure that the load is fixed correctly. Never step
under lifted loads. Please observe the effective accident prevention
regulations for your business.
Содержание GB 32
Страница 5: ...Stand 02 01 09 GB 32 Geared head drill Page 5 of 54 20 ACCEPTANCE CERTIFICATE 54 ...
Страница 37: ...Stand 02 01 09 GB 32 Geared head drill Page 37 of 54 7 Exploded drawing 7 1 Table foot ...
Страница 39: ...Stand 02 01 09 GB 32 Geared head drill Page 39 of 54 9 Exploded drawing 9 1 Exploded drawing gear housing 1 ...
Страница 40: ...Stand 02 01 09 GB 32 Geared head drill Page 40 of 54 9 2 Exploded drawing gear housing 2 ...
Страница 42: ...Stand 02 01 09 GB 32 Geared head drill Page 42 of 54 11 Exploded drawing 11 1 Exploded drawing feed ...
Страница 44: ...Stand 02 01 09 GB 32 Geared head drill Page 44 of 54 13 Exploded drawing 13 1 Exploded drawing drilling head 1 ...
Страница 45: ...Stand 02 01 09 GB 32 Geared head drill Page 45 of 54 13 2 Exploded drawing drilling head 2 ...
Страница 51: ...Stand 02 01 09 GB 32 Geared head drill Page 51 of 54 17 Circuit diagram 17 1 Circuit diagram GB 32 ...