background image

General

All EPE accumulators are carefully inspected and tested at 
the  factory  and  are  exactly  as  designated  by  the  code 
printed on the name plate.
In addition  the name plate carries the accumulators serial 
number and if specified on order, the value on precharge.

On the accumulator shell are also marked :
Manufacturer's serial number & date shell manufactured; 
identification mark; design standard applicable; maximum 
recommended  working  pressure;  temperature  range; 
capacity in liters.
Accumulators  are  normally  supplied  empty  (uncharged). 
Nitrogen precharged units can be supplied on request.
ATTENTION:  The  max  working  pressure  marked  on  the 
accumulator must be 

 that the calibrated pressure of the 

relief valve.
Before undertaking any work on the hydraulic circuit for 
mounting  an  accumulator,  it  is  required  to  release  the 
pressure completely.
Test  certificates  if  required  are  supplied  with  the 
accumulator, or forwarded by mail.

Installation

To  achieve  a  high  degree  of  efficiency,  the  accumulator 
should be fitted as close as possible to the installation it 
serves.
The space necessary for testing and filling equipment is at 
least 150mm above the gas-fill valve.

POSITION is possible from vertical one (gas valve on top) 
to the horizontal one.
The manufacturers name plate stating initial pressure must 
remain visible.
Access to vent screw must be kept unobstructed.
MOUNTING  by  means  of  clamps,  brackets  and  rubber 
support rings.

The mounting must be such that should a rupture occur 
on the pipe system at the liquid connection, or should the 
gas-fill  valve  break,  the  accumulator  cannot  be  pulled 
from its mounting by the forces involved.

No welding or other mechanical process must be carried 
out on the accumulator shell for the purpose of attaching 
fastenings.

CONNECTION  adopters  and  flanges  are  available  on 
request. When fitting screws, reducers or the safety and 
shut-off block, care must be taken that the accumulator 
is held firmly by means of  a spanner at the liquid valve, 
so that the liquid valve is not turned independently of the 
accumulator body.

To guarantee trouble free operation, the following points 
should be observed: 

Ÿ

A  non-return valve  to  be  fitted  between  pump  and 
accumulator to prevent reversal.

Ÿ

A relief valve must be fitted close to the accumulator 
and  set  at  lower  than  the  max.  working  pressure 
marked on the accumulator shell.

Ÿ

A shut-off valve and a dump valve are recommended 
to enable periodic checks or removals during normal 
operation. EPE safety blocks 

Type B 

incorporate all 

the essential functions.

Preliminary Checking

Upon receipt check:
That there has been no damage in transit.
The identification code is as ordered.
Before installation it is most important to ensure that the 
gas pressure corresponds to the desired value.
The  initial  gas  pressure must  be  selected  to  meet  the 
service requirement.
In general the design values are as follows:
P0 = 0.9 P1, ( energy reserve, line shock absorber, etc.)
P0 =  0.6 - 0.7 P1 ( pulsation damper )
Gas precharge pressure is of crucial importance to the 
correct functions of the accumulator and the durability of 
the bladder.
The gas pressure, when the accumulator is supplied pre-
charged is related to the temperature of 20°C.
In the case of accumulators supplied without pre-loading 
pressure, or after repair work it is necessary to perform 
inflation with nitrogen; must also be performed also the 
verification of the system by using the equipment type-
PC following procedure - Checking & Charging - page-20.

Operation & Maintenance

Clamp

Supporting
Ring

Bracket

19

Fig.14

Содержание AS 0.2

Страница 1: ...he accumulator shell An inert gas nitrogen is filled into the bladder through a pressure valve to a pressure P The bladder expands filling 0 the entire volume V of the accumulator shell 0 When the sys...

Страница 2: ...ruction which is unique to EPE is moulded in a single piece thus obviating problems associated with seamed construction The gas valve is fitted in such a manner which allows it to be connected easily...

Страница 3: ...in Gas Precharge Pressure page 3 are valid although as the pressure and above all the velocity of the yield required increase there is the danger that in each cycle the bladder will knock against the...

Страница 4: ...For Food P standard B V E K N H F Y A 5 Shell material Carbon Steel Nickel Coated Carbon Steel Stainless Steel Rilsan Coated Carbon Steel C standard N X V 4 Max working pressure Bar For 0 2 AS For 0...

Страница 5: ...r variants 01 02 03 04 05 06 07 08 09 10 11 12 13 zz for S 1 1 16 12 1 5 8 12 1 7 8 12 21 22 23 for M M14x1 5 M16x1 5 M18x1 5 M22x1 5 M27x2 0 M32x1 5 M33x1 5 M40x1 5 M42x1 5 M45x1 5 M50x1 5 31 32 33 3...

Страница 6: ...g8 1 4 BSP M16x2 0 5 16 UNEF 7 8 UNF Gas Fill Valve Body Double Lock Military Valve 7 8 UNF Integral in 7 8 UNF Gas Valve M28x1 5 V standard X 0 1 2 3 4 8 9 M 9 Test Certification Factory Testing CE P...

Страница 7: ...2 NPTF Port Adapter with VS214 Gas Safety Valve set at xxx bar Adapter with VS224X Gas Safety Valve set at xxx bar Adapter with 1 4 BSP Needle Valve Adapter with 1 4 BSP Needle Valve in SS Adapter wi...

Страница 8: ...SWP 28 ASWP 35 ASWP 37 ASWP 55 330 360 330 330 360 30 48 70 120 165 bar Pre Max Model A D C F I B E H A F1 A F2 kgs ltrs R G Wt Vol Dry Gas Fluid Port Connection BSP 250 280 300 355 540 405 465 530 57...

Страница 9: ...XXX C13384 N10144 O10221 P10149 Q10226 S10228 161013 A12022 H12025 R12031 B10202 C10205 E10109 F10103 ASSY17 G10305 I10222 211030 K10227 L10223 M10217 05XXXX C13384 N10144 O10221 P10149 Q10226 S10228...

Страница 10: ...ASLVHF 475 ASLVHF 530 ASLVHF 575 Model A F1 A F2 32 70 70 80 120 11 14 56 56 140 140 74 88 130 I H 290 460 355 412 472 470 610 750 895 1025 1325 1392 1791 1132 1347 1688 1787 2112 2552 2805 2987 1222...

Страница 11: ...ASWD 4 6 ASWD 10 55 ASLV 150 575 ASLVHF 150 575 B10202 C10205 E10109 F10103 ASSY17 G10305 06XXXX C13384 I10446 212013 A12042 R12385 A12042 N A B10333 C10334 E10302 F10301 ASSY17 G10306 06XXXX C39XXX...

Страница 12: ...thout Gas Fill Valve Transfert Liquid Separator type 5 16 UNEF Vg8 1 4 BSP M16x2 0 5 16 UNEF 7 8 UNF Gas Fill Valve Body Double Lock Military Valve 7 8 UNF Integral in 7 8 UNF Gas Valve M28x1 5 V stan...

Страница 13: ...suitable for operating temperature 20 C to 85 C Other materials as indicated in ordering code also available THE GAS VALVE is of phosphated carbon steel in the following three versions S STANDARD Fitt...

Страница 14: ...ype M22 M22 B Type M50 Type M30 Type M22L Type M50L Type MU7 8U Type MU7 8V 5 8 UNF M30x1 5 M22x1 5 M22x1 5 M50x1 5 7 8 UNF Fill Valve Fill Valve Fill Valve Fill Valve Fill Valve M50x1 5 M50x1 5 M50x1...

Страница 15: ...fer Bladder Ordering Code Page 12 15 Type U7 8 Type U7 8V U7 8V B Type U7 8U Type U5 8 SL Type M22 SL Type M50 SL Type M22 ST Type M50 ST M50x1 5 M50x1 5 M22x1 5 M22x1 5 7 8 UNF 7 8 UNF Fill Valve 7 8...

Страница 16: ...for screw in fill valve M50x1 5 M Body for screw in fill valve long body 7 8 UNF M Body for screw in fill valve 7 8 UNF M with Integral Vg8 fill valve 7 8 UNF M with Integral Vg8 fill valve for Bosch...

Страница 17: ...BD 50 BD 75 360 360 360 bar Pre Max Model kgs ltrs Fig Wt Vol Dry Gas 8 9 10 Gas Bottle design Accumulator design Neck design Threaded design Ordering Code Dimensions Gas Bottles 1 2 3 4 5 6 BB 0 360...

Страница 18: ...ensions determined by the flow rate and operating pressure connects the various blocks The two ends have a BSP female thread or on request are flanged One of the ends is closed off with a plug or blin...

Страница 19: ...cal process must be carried out on the accumulator shell for the purpose of attaching fastenings CONNECTION adopters and flanges are available on request When fitting screws reducers or the safety and...

Страница 20: ...ng a pressure slightly above the required level Close the valve of nitrogen cylinder and disconnect the charging hose from the equipment Wait for the gas temperature stabilization Set the pressure by...

Страница 21: ...esired pressure Adjust by means of bleed valve remove the filling unit Use soapy water test for leaks Replace the valve cover and protection cap The accumulator is ready for use Standard equipment PC...

Страница 22: ...id port body into the vessel and remove the gasket and O Ring Fig D 4 Remove by bending the rubber coated retaining ring Fig D 5 Remove the fluid port body Fig D 6 Remove the nut holding the gas valve...

Страница 23: ...Charging page 20 and again tighten the gas valve nut Low Pressure Range ASWD Insert the bladder use a threaded tube M 12 x 1 5 Mount name plate and nut for the gas valve body Tighten the nut holding t...

Страница 24: ...ifferent fluid than those designed for Installation Before installation you must perform a visual check to verify that the accumulator has not suffered any damage during shipping handling Verify that...

Отзывы: