Relay Box for Infrared Cabins - Installation Instructions
45
Installing multiple cabins
6.2 Control lines and cabin addresses
Control lines must only be plugged into the corresponding jacks on the cir-
cuit boards of the control units and relay boxes.
Jacks – SBM-LSG-IR
Jacks – EmoTouch 3 circuit board
A
RJ14 plug from control unit
B
RJ10 plug for sensor line
A
B
7/8
5/6
3/4
1/2