33
EN
Maintenance
Maintenance involves the following tasks:
• Lubricate the ball bearing
• Refill the disinfectant or replace the tank.
• Descale the water circuit.De-scale the water
circuit.
Lubricate the ball bearings.
• Cut the cable ties.
• Lift the foam cover off.
• Grease the ball bearings.
• Place the foam cover on top and affix with a
cable tie.
Foam cover
Caution!
Risk of injury from electrical voltage.
Always disconnect the machine from the
power supply before carrying out any
maintenance.
Maintenance work
Fig. 11
Remove the covers
Servicing requires the hood to be open.
• Remove the mains plug.
• Lift the hood off the housing.
Abb.10
Maintenance interval
The flake ice machine must be serviced every
six months.
The cooling system for ice production is
a closed system with 0,36 kg R134a gas.
Normally, no refill is necessary.