
10
In the illustration shown the flexible piping would cross in
order for the correct connection into the inlet side and the
outlet side of this valve.
Your configuration may vary
IllusTraTIoN aboVe rePreseNTs THe serVICe PosITIoN:
In & out valves are open and bypass valve in closed position
CAUTION:
all valves should remain closed until startup procedure
in raw
water supply
bypass
closed
connect to
inlet
connect to
outlet
Plumber installed
bypass is required
2.0” brass close or shoulder nipples, 2.0” corrugated flexible
stainless, all incoming/outgoing piping and 3 ball valves are
not supplied
FOR ILLUSTRATION
PURPOSES ONLY:
This is an example of 3 valve bypass using corrugated flexible stainless to make the final connections with the valve.
Configuration may vary
RECOMMENDATION
leT’s buIld THe byPass agaINsT THe Wall,
use less space and make the correct connections:
1. build your bypass.
2. secure against the wall.
3. Connect 24” flexible corrugated stainless to your bypass.
4. Create a gentle curve in the flexible piping to avoid rigid connection.
5. Using 2.0” close or shoulder nipples connect your flexible piping to the proper inlet and outlet on the valve
NOTE:
Valve has flow in & out direction arrows on the brass inlet & outlet
If you build a bypass and secure to the wall, using
the required flexible piping will allow you to move the
system close to the wall.
This will also allow you to move the flexible piping to
connect to the proper inlet and out of the valve and
assist with the installation where rough plumbing and
finish measurements are slightly off
bypass - big picture with some great information
out filtered to
home or facility
Содержание CWL-1665-2
Страница 18: ...18...