EP-2000 DIN INSTALLATION GUIDE
5
Wiring for loads greater than 15 amps:
1. Screw in the input neutral from the incoming neutral source to screw terminal number 1.
2. Screw in the input phase from the incoming power source to screw terminal number 4.
3. Screw in the input neutral from the incoming neutral source to the incoming neutral terminal of the load.
4. Screw in the input phase from the incoming power source to the incoming phase terminal of the load.
PLC Power Supply
Load at Greater than 15A
DIN RAIL
Input Voltage
N
1 2 3 4 5
L
HOT
HOT
NEUTRAL
NEUTRAL
NEUTR
AL
L 3
L 2
L 1
*Do not install on loads greater than 25 amps
®
*also use this install method if the output wire size is larger than AWG#12
CAUTION – Ungrounded power systems are inherently unstable and can produce excessively high line-
to-ground voltages during certain fault conditions. During these fault conditions any electrical equipment,
including an SPD, may be subjected to voltages which exceed their designed ratings. This information is being
provided to the user so that an informed decision can be made before installing any electrical equipment on
an ungrounded power system.
Содержание EP-2000 DIN
Страница 3: ......