background image

4

EP-2000 DIN INSTALLATION GUIDE

Wiring for loads 15 Amps or less:

1.  Screw in the input neutral from the incoming neutral source to screw terminal number 1.

2.  Screw in the input phase from the incoming power source to screw terminal number 4. 

3.  Screw in the output neutral to screw terminal number 2 and connect to the input neutral terminal of the load.

4.  Screw in the output phase to screw terminal number 5 and connect it to the input phase terminal of the load. 

PLC Power Supply

DIN RAIL

Input Voltage
N

1 2 3 4 5

L

HOT

HOT

NEUTRAL

NEUTRAL

NEUTR

AL

L 3

L 2

L 1

®

CAUTION – Ungrounded power systems are inherently unstable and can produce excessively high line-
to-ground voltages during certain fault conditions. During these fault conditions any electrical equipment, 
including an SPD, may be subjected to voltages which exceed their designed ratings. This information is being 
provided to the user so that an informed decision can be made before installing any electrical equipment on 
an ungrounded power system.

Отзывы: