TO SUPPLY POWER TO THE EXHAUST BLOWER:

Install an amour coated electrical cable from the exhaust blower housing, through the wall thimble, and 

attach to the pre-drilled hole in the left hand rear hopper pillar. Hook up to wires from the wiring harness 

for the exhaust blower. All electrical connections must be in accordance with local code requirements (see 

W

IRING

 D

IAGRAM

).

Installation

Vent termination cap

(stainless steel termination

hood) or 45° elbow

90° elbow

Wall strap

(recommended with

use of vent pipe)

Exterior blower

and housing

Vent pipe or 2 foot

(610 mm) riser

Pipe adapter (if

using 2 foot riser)

Wall framing

Wall thimble

Horizontal frame

for thimble

Armour cable supplying

power to exterior blower

Siding

Figure 21: Exhaust Blower Installation; Horizontal Termination. 

9.  Connect the wires in the stove. Re-install the left side access cover to the stove and the back grill on 

the exterior vent housing.

10. Set the Slider Damper as described in the 

I

NSTALLATION

 - S

LIDER

/D

AMPER

 S

ETTING

“ section. 

NOTE:

Ensure that all vent connections are installed by placing three (3) screws evenly spaced and a small bead 

of high temperature silicone at each chimney connection. Also ensure that all vertical vent sections are 

properly supported and that all clearances to combustibles are maintained in accordance with the vent 

manufacturer’s specifications.

18

Содержание Empress-1 FS

Страница 1: ...LY INJURY OR EVEN DEATH Contact your building or fire officials about restrictions and installation inspection requirements in your area Empress 1 FS W A R R A N T Y R E G I S T R A T I O N e n v i r...

Страница 2: ...Wall Installation 10 Horizontal Exhaust Through Wall Installation 10 Vertical Rise with Horizontal Termination Installation Recommended 12 Through Concrete Wall With Vertical Rise Installations 12 Ins...

Страница 3: ...sure proper combustion air is admitted to the combustion chamber Setting the proper combustion air is achieved by adjusting the slider damper located on the left side of the stove When installing the...

Страница 4: ...TECTOR Smoke detectors should be installed and maintained in the structure when installing and operating a pellet burning appliance OPERATION The ash pan and door must be closed securely for proper an...

Страница 5: ...FACTURE DATE DE FABRICATION J F M A M J J A S O N D 2005 2006 2007 CAUTION Hot while operating Do not touch severe burns may result Keep children clothing furniture gasoline or other flammable vapors...

Страница 6: ...inches 180 cm cross sectional area 5 This unit must not be installed directly onto carpet If it is to be installed on a carpeted area a solid surface wood metal or approved hearth pad must be installe...

Страница 7: ...les for Freestanding Empress CLEARANCES TO COMBUSTIBLES These dimensions are minimum clearances but it is recommended that you ensure sufficient room for serving routine cleaning and maintenance This...

Страница 8: ...he appliance normally used for the leveling legs Ensure the unit is electrically grounded to the chassis of your home permanently Ground wire directly connected to metal chassis Hearth Pad Flooring St...

Страница 9: ...recommended for all installations Failure to install intake air may result in improper combustion as well as the unit smoking during power failures When connecting to an outside fresh air source do no...

Страница 10: ...ermination locations Table 1 Use in conjunction with Figure 9 for allowable exterior vent termination locations Letter Minimum Clearance Description A 24 in 61 cm Above grass top of plants wood or any...

Страница 11: ...ing wiring etc 2 Install a non combustible hearth pad where necessary 3 Place the appliance 15 37 5 cm away from the wall If the stove is to be set on a hearth pad set the unit on it 4 Locate the cent...

Страница 12: ...led seal as required Installation Figure 11 Straight through wall Installation 10 The pipe must extend at least 12 30 cm away from the building If necessary bring another length of pipe PL type to the...

Страница 13: ...installation to use if there is a concrete or retaining wall in line with exhaust vent on pellet stove The termination must be 12 305 mm from the outside wall and 12 305 mm above the ground Figure 14...

Страница 14: ...ner so when the pellet vent is installed vertically it will be 3 76 mm away from a combustible wall 3 Locate the center of the fresh air intake pipe on the unit Match that center with the same point o...

Страница 15: ...ean out on the outside of the house 2 Install PL vent upward from the tee Make sure that you install support brackets to keep the vent straight and secure 3 Install ceiling thimble and secure the flas...

Страница 16: ...2 Install a positive flue connector at the fireplace dampers 3 Connect a clean out tee or a 90 elbow to the exhaust pipe 4 Install flexible stainless steel liner or listed pellet vent to the top of t...

Страница 17: ...blower housing 3 Install the round cover plate over the gasketed opening in the stove where the exhaust motor was removed from 4 Install the exhaust blower motor in the Exterior Vent Housing Box onto...

Страница 18: ...dapter if using 2 foot riser Wall framing Wall thimble Horizontal frame for thimble Armour cable supplying power to exterior blower Siding Figure 21 Exhaust Blower Installation Horizontal Termination...

Страница 19: ...the lowest point Installation THROUGH WALL VERTICAL INSTALLATION WITH EXHAUST BLOWER Refer to INSTALLATION INSTALLATION WITH EXTERIOR MOUNTED EXHAUST BLOWER and INSTALLATION OUTSIDE VERTICAL INSTALLA...

Страница 20: ...d Heat Indicator If the heating load is not great enough when the stove is on low the high limit switch will turn the stove off and the switch will have to be manually reset To reset the high limit sw...

Страница 21: ...lity is a major factor in how the pellet stove will operate If the pellets have a high moisture content or ash content the fire will be less efficient and has a higher possibility of the fire building...

Страница 22: ...ed in the on off thermostat mode then turn the thermostat up to call for heat Check the heat level indicator If the 2 light is flashing refer to 4 Light 2 on Heat output bar flashing Check the fuse on...

Страница 23: ...enting system have stove and venting cleaned and inspected Severe negative pressure in area where unit is installed check the operation by opening a window does this solve the problem If it does insta...

Страница 24: ...fuse on the circuit board NOTE The ignitor should be bright orange in color If not replace the ignitor 9 Control settings Heat Level has no effect on the fire Note If the system light is flashing the...

Страница 25: ...Yellow Yellow Grey Grey Grey Grey Purple Purple Blue 115V Black 220V Brown Black Black Black Blue Black Armor Cable Supplied Vacuum Switch Combustion Blower Optional Exterior Exhaust Blower Power Cor...

Страница 26: ...Pellet Stove Cleaning Brush EF 156 External Exhaust Kit 3 pipe 20 070 Door Screen 50 177 6 Heat Exchanger Rod 50 181 7 Brick Panel Retainers set of 2 50 185 8 Front Casting Mounts Right Left 50 199 9...

Страница 27: ...491 20 Back grill 50 1362 21 Access Panel Left 50 1363 22 Access Panel Right 50 1364 23 Stainless Steel Burn Pot Liner Low Ash 50 1365 24 Ignition Burn Pot 50 1366 25 Slider Damper Plate 50 1367 Exhau...

Страница 28: ...Red 50 229 33 Cast Front Complete Doors Ash Shelf Pearl Grey 50 230 33 Cast Front Complete Doors Ash Shelf Wedgewood Blue 50 231 33 Cast Front Complete Doors Ash Shelf Westport Green 50 232 33 Cast F...

Страница 29: ...o Grate Antique White 50 251 37 Cast Top Only No Grate Diamond Black 50 252 37 Cast Top Only No Grate Inferno Red 50 253 37 Cast Top Only No Grate Pearl Grey 50 254 37 Cast Top Only No Grate Wedgewood...

Страница 30: ...EMPRESS Components 115V October 2006 Parts Diagram Components 30...

Страница 31: ...31 Parts Diagram Steel Cast EMPRESS Steel Cast 115V July 2012 12 18 28 38 26 29 24 23 17 9 32 33 35 34 37 36 22 10 16 7 21 13 20 19 12 6 8...

Страница 32: ...restrictions and exclusions apply to this warranty Limited Two 2 Year Warranty Under this warranty Sherwood Industries Ltd covers Ignitor Auger Motor Circuit Board Timers Temp Sensors Blowers Vacuum...

Страница 33: ...ullify the Limited Warranty on this stove If unsure as to the extent of this Limited Warranty contact your authorized Enviro dealer before installation 10 Sherwood Industries Ltd will not be responsib...

Страница 34: ...r warranty service fee reimbursement schedule Labour rates are set per component and as such total labour costs may not be covered 27 Sherwood Industries Ltd is not liable for freight or labour on any...

Страница 35: ...AL NUMBER ___________________________ DATE OF PURCHASE _____________ dd mm yyyy DATE OF INSTALLATION ___________ dd mm yyyy MAGNEHELIC AT INSTALL ___________________ INSTALLER S SIGNATURE ____________...

Отзывы: