15
31⁄2" (89mm)
8" (203mm) mantel
Combustibles
Cement Board
DV42DX
10"
(254mm)
12"
(305mm)
17"
(432mm)
20"
(508mm)
8" (203mm) mantel
Combustibles
Cement Board
DV42DX
with Manor
10"
(254mm)
12"
(305mm)
17"
(432mm)
Figure 18. Combustible Mantel Clearances for The
Manor
Figure 17. Combustible Mantel Clearances.
Initial Installation
QUALIFIED INSTALLERS ONLY
M
ANTEL
C
LEARANCES
:
It is not necessary to install a mantel, but if one is desired it is important to follow the guidelines shown
in Figure 17.
The Manor face has a different set of mantel clearances than the other faces, see
Figure 18.
Figure 19. Vent Termination Restrictions, refer to Table 2.
V
ENT
T
ERMINATION
R
ESTRICTIONS
:
A
A
D E
L
B
C
F
B
B
B
J
M
K
G
H
I
Openable
Fixed
Closed
Openable
Fixed
Closed
Termination Cap
Air Supply Inlet
Gas Meter
G
G
Restriction Zone
(Termination not allowed)
N
O
Содержание DV42DX
Страница 35: ...35 Parts Diagram Components DV42DX Components November 2004 ...
Страница 37: ...37 Parts Diagram Options 1 2 3 4 5 ...