background image

of  the  sheet  metal  straps  back  towards  the 

vent cap, so the decorative wall thimble will 

conceal it (see left image in Figure 10).

STEP  7.

  Slide  the  decorative  wall  thimble  up  to  the 

wall  surface  and  attach  with  the  screws 

provided.  Apply  decorative  brass  or  chrome 

trim if desired (see right image in Figure 10). 

NOTES:  
(1) 

The four wood screws provided should be replaced 

with  the  appropriate  fasteners  for  stucco,  brick, 

concrete, or other types of siding.

(2) 

For  buildings  with  vinyl  siding,  a  vinyl  siding 

standoff, should be installed between the vent cap 

and the exterior wall (see Figure 11). Attach the 

vinyl siding standoff to the horizontal termination. 

The vinyl siding standoff prevents excessive heat 

from  possibly  melting  the  vinyl  siding  material. 

Note  that  the  horizontal  vent  termination  bolts 

onto  the  flat  portion  of  the  vinyl  siding  standoff 

(shaded area in Figure 11), so that an air space will 

exist between the wall and the vent termination.

NOTES:  
(1) 

The

 

horizontal run of vent pipe must be level and 

should have a 1⁄4 inch rise for every one foot 

of  run  towards  the  termination. 

Never  allow 

the vent to run downward. This could cause high 

temperature and may present the possibility of a 

fire.

(2) 

The  location  of  the  horizontal  vent  termination 

on  the  exterior  wall  must  not  be  easily  blocked 

or obstructed. Refer to “Initial Installation - Vent 

Termination Restrictions” section.

(3)

 When installing a vent pipe in a chase the minimum 

clearance to combustibles is 2” (5 cm).

Initial Installation

QUALIFIED INSTALLERS ONLY

Figure 11: Installing Vent Cap with Vinyl Siding Stand-Off.

Figure 12: Installing Horizontal Vent Termination.

STEP 4.

 Position the horizontal vent termination in the center of the 10” (25.4 cm) x 10” (25.4 cm) hole, and attach 

to the exterior wall with the four screws provided. Before attaching the vent termination to the exterior 

wall, run a bead of non-hardening mastic around the edges, so as to make a seal between the termination 

and the wall. The arrow on the vent termination should be pointing up, insure that the proper clearances 

to combustible materials are maintained.

STEP 5. 

Before connecting the horizontal run of the vent pipe to the vent termination, slide the

 

black decorative 

wall thimble cover over the vent pipe.

STEP 6. 

Slide the appliance and vent assembly towards the wall, carefully inserting the vent pipe into the cap 

assembly. It is important that the vent pipe extend into the vent cap a sufficient distance with a minimum 

of 11⁄4” (3.2 cm) overlap. Secure the connection between the vent cap pipe and the vent cap by attaching 

the two sheet metal straps extending from the vent cap assembly into the outer wall of the vent pipe. Use 

the two sheet metal screws provided to connect the straps to the vent pipe. Bend any remaining portion 

11

Содержание C-10365

Страница 1: ...plosion may result causing property damage personal injury or loss of life Installation and service must be performed by a qualified installer service agency or the gas supplier FOR YOUR SAFETY Do not store or use gasoline or other Flammable vapours and liquids in the vicinity of this or any other appliance EG40 070 Massachusetts installations Warning This product must be installed by a licensed p...

Страница 2: ...llation code Canada or National Fuel Gas Code ANSI Z223 1 2 USA To prevent injury do not allow anyone who is unfamiliar with the stove to operate it To prevent injury if the pilot or pilot and burners have gone out on their own open the glass door and wait 5 minutes to air out before attempting to re light the stove Always keep the area around this appliance clear of combustible material gasoline ...

Страница 3: ...n 12 Cathedral Ceiling Installation 15 Freestanding Direct Vent Kit With Coupler 15 Venting into a Class A Chimney 18 Mobile Home Installation 18 Electrical Requirements 19 Replacing The Blower 20 Adjusting The Venturies 20 Fuel Conversion 21 Gas Line Connection and Testing 22 Secondary Installation 23 Installation of Log Set and Embers 23 Operating Instructions 25 Lighting Instructions 25 Turning...

Страница 4: ... rating label Is not for use with solid fuels Is approved for bedroom or bed sitting room IN CANADA must be installed with a listed wall thermostat IN USA see current ANSI Z223 1 for installation instructions Must be installed in accordance with local codes If none exist use current installation code CAN CGA B149 in Canada or ANSI Z223 1 NFPA 54 in the USA Must be properly connected to an approved...

Страница 5: ... flue system clearance requirements Locate the stove where it can be accessed by a gas supply line Locate the stove in a large and open room that is centrally located in the house This will optimize heat circulation and comfort As the stove is equipped with a convection fan ensure that an electrical outlet is within 6 feet 1 8 m of the stove The flow of combustion and ventilation air must not be o...

Страница 6: ...ny B 12 in 30 cm 9 in 23 cm Clearance from window or door that may be opened C 12 in 30 cm Clearance from permanently closed window to prevent condensation D 24 in 60 cm Vertical clearance to ventilated soffit located above the terminal within a horizontal distance of 2 ft 60 cm from center line of terminal E 18 in 45 cm Clearance to unventilated soffit F 12 in 30 cm Clearance to outside corner G ...

Страница 7: ...pipes can not exceed 33 feet 10 1 m Any combination of rise and run can be used as long as it lays within the shaded area a total of three 3 90 elbows or six 6 45 elbows can be used In addition to what is shown if a 90 elbow is used in the horizontal plane 3 feet 91 4 cm must be subtracted from the allowable horizontal run for each 45 elbow 11 2 feet must be subtracted from the allowable horizonta...

Страница 8: ...14 5 8 pipe adjustable 907 4DT 9 9 pipe length 4DT AJ 4 to 10 pipe adjustable 906 4DT 12 SV4L12 12 pipe length SV4LA12 11 2 to 12 pipe adjustable 904 4DT 24 SV4L24 24 pipe length 943 4DT AF6 Flashing 0 12 to 6 12 roof pitch 903 4DT 36 SV4L36 36 pipe length 943S 4DT AF12 Flashing 7 12 to 12 12 roof pitch 902 4DT 48 SV4L48 48 pipe length SV4FA Flashing 1 12 to 7 12 roof pitch 945 4DT EL45 SV4EBR45 4...

Страница 9: ... for vertical installations measure the distance from the appliance flue outlet to the ceiling the ceiling thickness the vertical rise through the attic or second story and allow for sufficient vent height above the roof line For two story applications a fire stop is required at each floor level If an offset is needed in the attic additional pipe and elbows will be required To connect the venting ...

Страница 10: ...nd fittings are designed to slide straight onto the male ends of adjacent pipes and fittings by orienting the four pipe indentations so they match and slide into the four entry slots on the male end 2 Horizontal runs of vent pipe must be supported every three feet Wall straps are available for this purpose also when running horizontal pipe minimum clearances to combustibles must be maintained 2 in...

Страница 11: ...on Vent Termination Restrictions section 3 When installing a vent pipe in a chase the minimum clearance to combustibles is 2 5 cm Initial Installation QUALIFIED INSTALLERS ONLY Wood screws x4 Cut vinyl siding away to fit standoff Bolt x4 required Nut x4 required Wood screw x4 required Figure 11 Installing Vent Cap with Vinyl Siding Stand Off Figure 12 Installing Horizontal Vent Termination STEP 4 ...

Страница 12: ...xit and mark the location where the vent will penetrate the ceiling Drill a small hole at this point Next drop a plumb bob from the roof to the hole previously drilled in the ceiling mark the spot where the vent will penetrate the roof Determine if ceiling joists roof rafters or other framing will obstruct the venting system You may wish to relocate the appliance or to offset to avoid cutting load...

Страница 13: ...ine STEP 5 Cut hole in the roof centered on the small hole placed in the roof from Step 2 The hole should be of sufficient size to meet minimum requirements for Clearance to Combustibles as specified Continue to assemble lengths of pipe and elbows necessary to reach from the ceiling support box up through the roof line Galvanized pipe and elbows may be utilized in the attic as well as above the ro...

Страница 14: ...45 degree elbows instead of 90 degree elbows The 45 degree elbow offers less restriction to the flow of flue gases and intake air Initial Installation QUALIFIED INSTALLERS ONLY plumber s tape connected to wall strap Wall strap 45 elbows x2 Nails Ceiling firestop Ceiling Second floor Use clearances to as defined by appliance and vent pipe manufacturers NOTES 1 For multi story installations A ceilin...

Страница 15: ...s cut the Support Box from the top corners down to the roof line and fold the resulting flaps over the roof sheathing Figure 20 Before nailing it in to the roof run a bead of non hardening mastic around the top edges of the Support Box to make a seal between the box and the roof Clean out any combustible material from the inside of the Support Box STEP 6 Complete the cathedral ceiling installation...

Страница 16: ...11 Stretch the liner out Attach the flexible liner to the vent termination cap by placing a small bead of high temperature silicone on the vent termination and slide the flex liner onto the vent terminal and secure with three 3 sheet metal screws evenly spaced 12 Dress the flex liner through the wall thimble and attach the vent terminal to the outside of the house using four 4 wood screws provided...

Страница 17: ...straight sections of pipe slipping all joints together and installing with three 3 sheet metal screws evenly spaced 21 Install the brass decorative rings around each joint making sure this decorative ring covers the sheet metal screws that secure each section of pipe together and secure to vent pipe in the slotted tab on the backside of the pipe so that the fastener would not be seen 22 Secure the...

Страница 18: ...h the flex liner to the adapter Secure the cap adapter to the CLASS A chimney ensuring an airtight seal Install the vertical termination cap Light the unit and ensure proper operation THE USE OF ANY EXISTING CHIMNEY AS AN AIR INTAKE IS NOT COVERED UNDER THE ANSI Z21 88 2002 CSA 2 33a 2002 TEST METHODS AND THE RESULTING ITS WH PRODUCT CERTIFICATION THE CODE AUTHORITY HAVING JURISDICTION MUST BE CON...

Страница 19: ...gged directly into a properly grounded three prong outlet DO NOT cut or remove the grounding prong from this plug CAUTION Label all wires prior to disconnection when servicing controls Wiring errors can cause improper and dangerous operation Verify proper operation after servicing NOTE Operation of the fan increases the efficiency and the heat output of the appliance The thermostat connects to the...

Страница 20: ...tall dark stringy tips are not getting enough air Open the venturi until the flames clean up If the venturi is opened or closed all the way and the correct flames cannot be attained turn off the gas and contact the dealer Warning Incorrect venturi adjustment may lead to improper combustion which is a safety hazard Contact the dealer if there is any concern about the venturi adjustment Initial Inst...

Страница 21: ...rsion kit Screw the new injector inside the pilot assembly and re install the hood by placing the hood on the assembly line up the keyway and snap into place STEP 9 Remove the two 2 main burner orifices using a 1 2 deep socket STEP 10 Install the two 2 new orifices supplied making sure that the orifices are in the correct location Be sure to put a bead of pipe thread sealant or approved Teflon tap...

Страница 22: ...rom the gas supply piping system by closing its individual manual shutoff valve during any pressure testing of the gas supply piping system at test pressures equal to or less than 1 2 psig 3 45 KPa Always check for gas leaks with a soap and water solution after completing the required pressure test TO TEST VALVE PRESSURES The pressure taps are located on the left side of the valve Turn set screw 1...

Страница 23: ...2 or 35 for proper ember placement DO NOT pack this ember material as this could create an unsafe condition leave embers loose 2 Carefully remove logs from box Check to ensure there is no damage It is very important to install all logs in their proper position to insure safe optimum operating conditions 3 Place the log set into the firebox Locate each log by seating it down onto the burner tray su...

Страница 24: ...n on for the first 4 hours This will cure the paint logs gasket material and the other products used in the manufacturing process It is advisable to open a window or door as the unit will start to smoke and can irritate some people After the unit has gone through the first burn turn the unit off including the pilot let the unit get cold then remove the glass door and clean it with a good gas firep...

Страница 25: ...nutes to clear out any gas Close door If you smell gas including near the floor STOP Follow B in the above safety information Leak test all gas joints with soapy water NEVER USE AN OPEN FLAME FOR LEAK TESTING If you don t smell gas go to next step 5 Find the pilot located to the right between the front and rear burner 6 Turn gas control knob counter clockwise to PILOT 7 Push the gas control knob i...

Страница 26: ...son To clean the door use a mild glass cleaner and a soft cloth or a glass cleaner available from your Enviro dealer Abrasive cleaners will damage the glass TO REPLACE DOOR The glass in this appliance is an integral part of the door assembly If the glass is damaged or broken a replacement inner door with glass assembly must be purchased The glass in this appliance is ceramic If the glass is damage...

Страница 27: ... pilot dies while knob is depressed Bleed line Check gas line pressure Contact dealer Burners will not remain lit Problem with thermopile circuit Check gas line pressure Check for flame impingement on thermopile If low see Pilot will not remain lit Check thermopile for minimum of 200 mV when burner is switched on Check wiring to thermostat for breaks Flame lifting Leak in vent pipe Check for leaks...

Страница 28: ...4 5 Burner Switch EC 025 6 Miniature Light Bulb 115V EC 031 6 Light Bulb Holder EC 032 Wiring Harness Complete 2 pieces EC 037 Body Wiring Harness EC 037A Burner Wiring Harness EC 037B Fan Control Knob EC 040 IEC Power Cord 115V EC 043 4 oz Bag Coal Embers Only EC 045 7 1 x 1 Side Cabinet Hinge EC 054 Pedestal Door Magnet EC 056 3 8 Tadpole Door Gasket 7 ft EC 057 Window Channel Tape 72 EC 058 8 D...

Страница 29: ...ing EG40 130 18 Pedestal Door EG40 135 LP to NG Conversion Kit EG40 200 NG to LP Conversion Kit EG40 202 19 Ash Sill EG40 213 20 Door Hinge Set of 2 EG40 302 21 Fan Mount EG40 304 22 Pedestal Box Cover EG40 307 23 Burner Control Assembly NG 30 014 23 Burner Control Assembly LP 30 015 24 Front Pan Burner 30 016 25 Rear Burner with Venturi 30 017 Pilot 1 8 Tube with Ferules 30 043 Log Set Complete 5...

Страница 30: ...Parts Diagram Chassis EG 40 Body Chassis July 2004 30 ...

Страница 31: ...31 Parts Diagram Gas Tray Door EG40 Gas Tray Door Assemblies July 2004 27 8 20 9 23 2 4 5 10 6 11 16 26 25 24 3 ...

Страница 32: ...y on all the Electrical Components and Gas Components against manufacturing defects Paint is covered against flaking This offer includes parts and labor for 1 year and for parts only thereafter Your dealer shall make all claims under this warranty in writing WHEN FILING A WARRANTY CLAIM PLEASE COMPLETE THE FOLLOWING INFORMATION ON AN OFFICIAL WARRANTY CLAIM FORM TO THE DEALER Name address and tele...

Страница 33: ..._____________________________ MODEL ___________________________________ SERIAL NUMBER ___________________________ DATE OF PURCHASE _____________ dd mm yyyy DATE OF INSTALLATION ___________ dd mm yyyy NATURAL GAS NAT PROPANE LPG INLET GAS PRESSURE _________in wc MAIN BURNER ORIFICE __________ DMS PILOT ORIFICE _________OR________in diam INSTALLER S SIGNATURE ________________________________________...

Отзывы: