Modifying spring tension 

By removing the drive stopper from the main pinion splines and repositioning, you can increase or 
decrease the spring tension for windy conditions, or increased latch pressure. The drive unit must be 
removed from the header to make this adjustment Note: This will also change the manual opening and 
closing force (Check your code settings).  

1.  To lock the d

rive from moving manually rotate the drive coupler until a ¼” X 20 NC threaded hole 

is exposed through the cast housing coupler window (figure 4 A&B). Thread a machine screw in 
this hole.  

2.  Now slide the door arm on the main spline pinion and rotate until the stop block is 180 degrees 

from the casting stopper lug.  

3.  Lightly undo the Allen cap screw in the stop block and before removing mark the spline position of 

the pinch gap on the stop block (figure 5).  

4.  You can now remove the stop block and reinstall MAXIMUM 4-6 splines in either direction from 

the factory setting.  

5.  Moving the stop block forward to the opening travel will decrease the tension and moving the stop 

block away from the opening travel will increase the tension (figure 6).  

6.  Slide the stop block down the splines to the casting and re-tighten the Allen cap screw.  
7.  Reinstall the drive unit into the header and with the door arm slipped back onto the splines, rotate 

the main pinion till the stop block engages the casting stopper.  

8.  You can now reinstall the door arm in the correct position for backstop and re-tighten. You may 

have to adjust your back-check, latch activation 

 

 
 
 
 
 
 
 

 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

 

 

Figure 5

 

Figure 6

 

Marked line 

New mounting line to 
increase tension 

Figure 4A 

Figure 4B

 

Содержание Ditec FA-8

Страница 1: ...e all locks unless mechanically and or electrically interlocked to the power unit that are connected to the door before installing the operator 4 Install the door operator at least 8 feet or more above the floor if the operator has exposed moving parts 5 Do not connect the door operator to the source of power until instructed to do so 6 Locate the control station a within sight of the door b at a ...

Страница 2: ...llation 6 Electrical Connection 6 ARM ASSEMBLY INSTALLATION 7 Push Arm Installation 7 Pull Arm Installation 7 TUNING OF MOTOR GEARBOX 8 Door Stop Set Windy Conditions 8 Back check and Latching 8 To set back check 8 To set the latch 8 Modifying spring tension 10 CONTROL ADJUSTMENTS ANSI REQUIREMENTS 11 ADA Adjustments 12 Activating Devices 13 Electric strike 13 FINAL INSTALLATION PROCEDURES 13 Head...

Страница 3: ...ng cycles Manual door opening closing force during power failure 30 lbs Door opening closing speed Adjustable Door opening closing force Adjustable Shipping Inspection Verify that the order was shipped complete and correct including model number door swing color and header width NOTE The gearbox housing has the swing hand L or R stamped on the top of the motor mounting flange NOTE If any of the ab...

Страница 4: ...e with final approved shop drawings and within the guidelines of the enforced local electrical codes HEADER AND GEARBOX INSTALLATION Pre Mounting Header Box Instructions Power supply may be pulled into the header at the same time the jamb header assembly is positioned Make sure all power is turned off before handling the supply wires This should be done by a certified electrician and within the gu...

Страница 5: ...14 x 1 Pan Quad Type A screws provided 2 screws should be used at either end 1 2 in from end plate to fasten directly to the doors vertical jambs 2 more screws fasten the Header Body to the bottom of the doorframe approximately 10 in from either end The header should support 200lbs Pull Header Note Header on pull applications must be mounted so the main drive pinion safety washer and machine screw...

Страница 6: ...ied to the HA FA 8 operator The 115 5VAC supply lines are connected to the black primary wires coming from the transformer and the ground wire is attached to the operator header box Mount the power switch by drilling a hole in the header to the latch side of the unit The controller board settings have been pre set prior to shipment Adjustment information is detailed on page 16 It will be necessary...

Страница 7: ...inion spline by removing fender washer and X 20 NC dome head machine screw 8 Open door to desired full open position and reinstall the complete arm assembly onto the pinion spline 9 After final installation of the cast arm make certain that the Allen bolt is fully tighten using a 3 16 Allen wrench torque to approximately 20 lbs Fasten the fender washer with a X 20 NC dome head machine screw is fas...

Страница 8: ...e out at 90 degrees If a strong wind gust occurs the door will have an additional 10 to 15 degrees of movement to shear the effect Back check and Latching To set back check 1 Open the door to the fully open position magnet 1 lower magnet should cross over the back check switch where grey wire conductor plugs into green circuit board engaging back check speed 10 degrees prior to the door reaching f...

Страница 9: ...9 Left Hand Push Right Hand Push Closed Closed Open Open Right Hand Pull Left Hand Pull Closed Closed Open Open ...

Страница 10: ... the Allen cap screw in the stop block and before removing mark the spline position of the pinch gap on the stop block figure 5 4 You can now remove the stop block and reinstall MAXIMUM 4 6 splines in either direction from the factory setting 5 Moving the stop block forward to the opening travel will decrease the tension and moving the stop block away from the opening travel will increase the tens...

Страница 11: ...11 CONTROL ADJUSTMENTS ANSI REQUIREMENTS Adjusting elements are close to live electrical parts Electronic Controls ...

Страница 12: ...h allows selection of Closing Speed Detection of an overload current is persisting for longer than 2 seconds will cause the door to close The recommended procedure for adjustment of the control is as follows 1 Turn the Overload current control fully clockwise to increase the current limit to maximum and prevent any detection entirely This setting can be used to inhibit the overload detection shutd...

Страница 13: ... terminal 6 and ground terminal 3 FINAL INSTALLATION PROCEDURES Header Cover Installation After all adjustments have been finished the face cover must be installed to the header box There are 8 counter sunk screw locations on the underside of the face cover the outside pairs mount to the header box The inside pairs thread into the drive unit mounts take care starting the X 20 NC machine screws as ...

Страница 14: ...14 Sticker Placement ...

Страница 15: ...Manual Present the key and the AAADAM owner s manual to the owner or general contractor Demonstrate the unit review all safety features as well as the safety check that is to be performed by the owner each morning ...

Отзывы: