
Using LANVIEW
4-4 Troubleshooting
UP
Off
No valid connection to switch stackdown
connector.
1.
Make sure the switch connected to
the stackdown connector is powered
on.
2.
Replace cable with a known good
one.
3.
If the problem still exists, contact
Enterasys Networks for technical
support.
Green
Solid
. Valid connection to switch stackdown
connector.
Blinking
.
Information is being transferred over
the high-speed stacking cable.
None.
Manager
Off
Switch is operating as a Member in the stack.
None.
Green
Solid
. Switch is operating as the Manager of the
stack.
None.
RPS
Off
RPS not in use.
Internal power supply failure.
None.
If an RPS is connected to the switch and
should be providing power, perform the
following:
1.
Ensure the RPS is powered on.
2.
Ensure that the AC power cord to the
RPS is plugged in correctly and that
there is power at the AC power
source.
3.
Replace the power cord with a known
good one.
4.
Ensure the DC power cord from the
RPS to the switch is plugged in
correctly.
5.
If the problem persists, contact
Enterasys Networks for technical
support.
Amber
Solid
. The switch internal power supply failed,
and the RPS is providing the proper power to the
switch.
None.
Figure 4-2 LANVIEW LEDs (continued)
LED
Color
State
Recommended Action
Содержание SecureStack C2 C2G170-24
Страница 1: ...SecureStack C2 Gigabit Ethernet Switch Hardware Installation Guide C2G170 24 P N 9034109 01...
Страница 2: ......
Страница 14: ...xii...
Страница 18: ...Conventions Used in This Guide xvi About This Guide...
Страница 24: ...Getting Help 1 6 Introduction...
Страница 58: ...Completing the Installation 3 32 Hardware Installation...
Страница 66: ...Using the Password Reset Switch 4 8 Troubleshooting...