393800
‐
2
Rev
1:
02.058.2017.
KJK
We
reserve
the
right
to
change
technical
data
without
notice.
http://www.ensy.no
Page 14
Mounting
instructions
.
Page
14
to
27.
Table
of
contents:
1.
General
2.
Mounting
of
the
unit
2.1
Brackets
and
gaskets
to
avoid
vibration
2.2
Stopper
brackets
2.3
Mounting
of
cooker
hood
2.4
Duct
cover
2.5
Dimensions
and
technical
data
3.
Connections
3.1
Electrical
connections
3.2
Duct
connections
4.
Setting
the
airflow
5.
Alarms
1.
General
This
guide
is
made
to
provide
installation
and
user
instructions
regarding
the
correct
installation
of
AHU
300BV
and
BH.
AHU
‐
300
BV
and
BH
is
designed
for
heat
recovery
with
air
volumes
of
up
to
300
m³
/
h.
The
energy
from
the
exhaust
air
is
transferred
to
supply
air
through
the
rotary
heat
exchanger
where
the
air
streams
pass
each
other
without
making
contact.
The
unit
has
a
built
in
‐
heater
for
supplementary
heating
of
supply
air.
Humidity
sensor
for
forced
ventilation
is
integrated
into
ventilation
unit.
Control
panel
is
integrated
into
the
front
hatch.
Option
for
a
second
control
panel
to
be
connected
is
made
outside
the
unit.
The
unit
can
also
connect
additional
equipment
cooker
hood
over
the
stove,
pulse
switch
for
controlling
the
forced
ventilation,
for
example,
wet
rooms
or
bathrooms,
sensor
for
carbon
management
and
switch
management
away
/
home
function.
Control
of
these
options
are
integrated
into
AHU
‐
300
BV
and
BH.
AHU
300
‐
BV
and
BH
is
supplied
in
painted
finish,
tested
and
ready
for
operation.
Installation,
commissioning
and
tuning
must
be
performed
by
authorized
personnel.
2.
Mounting
Together
with
the
unit
is
delivered
the
following
equipment:
1.
Suspension
bracket
and
stoppers
2.
Wall
Bracket
with
vibration
dampening
gasket
3.
Self
‐
adhesive
vibration
damping
4.
Accessories
bag
containing
the
necessary
screws
5.
5
pcs.
plugs
for
connecting
additional
equipment.
6.
Key
for
opening
the
front
hatch.