50455/RTEX/0807
2
UTImeter Rtex
1. Table of contents
1.
TABLE OF CONTENTS .................................. 2
2.
GENERAL INFORMATION ........................... 4
2.1
S
HIPMENT NOTE
............................................ 4
2.2
I
NITIAL INSPECTION
....................................... 4
2.3
D
OCUMENTATION DISCREPANCIES
................ 4
2.4
W
ARRANTY
.................................................. 4
2.5
C
ERTIFICATION
............................................. 5
2.6
S
PARE PARTS
................................................ 5
2.7
S
ERVICE AND
R
EPAIR
................................... 5
3.
WORLDWIDE SERVICE STATIONS
NETWORK................................................................ 7
4.
RECOMMENDATION FOR SAFE USE........ 9
5.
FUNCTIONS - KEY FEATURES.................. 10
6.
DESCRIPTION................................................ 11
6.1
G
ENERAL
.................................................... 11
6.2
ULTRA
SENSING PROBE
............................. 13
6.2.1
Introduction ....................................... 13
6.2.2
Ullage detection................................. 13
6.2.3
Interface detection ............................. 14
6.2.4
Temperature measurement................. 14
6.3
T
APE
........................................................... 15
6.4
T
APE PROTECTION
...................................... 16
6.5
R
EADING INDEX
.......................................... 17
6.6
T
APE CLEANER
........................................... 18
6.7
A
DDITIONAL
L
OAD
(
OPTION
) ...................... 19
6.7.1
Viscous liquids (> 800 Cst)................ 19
6.7.2
Reference height and innage.............. 19
6.8
O
THERS
...................................................... 19
7.
EXAMPLES OF INSTALLATION OF THE
GAUGING SYSTEM .............................................. 20
7.1
G
ENERAL
.................................................... 20
7.2
E
XAMPLE OF INSTALLATION ON A PIPE
,
CONNECTOR
Q2 ...................................................... 21
7.3
E
XAMPLE OF INSTALLATION ON THE DECK
,
CONNECTOR
Q2 ...................................................... 22
7.4
E
XAMPLE OF INSTALLATION ON A PIPE
,
CONNECTOR
Q1 ...................................................... 23
7.5
E
XAMPLE OF INSTALLATION ON THE DECK
,
CONNECTOR
Q1 ...................................................... 24
8.
OPERATION ................................................... 25
8.1
B
ASIC RULES CONCERNING THE
5-
KEY
CONTROL PAD
......................................................... 25
8.2
S
ELECTING THE LANGUAGE
......................... 26
8.3
S
ELECTING THE TEMPERATURE SCALE
........ 27
8.4
S
ELECTING THE TEMPERATURE RESOLUTION
28
8.5
A
CTIVATING THE
LED ................................ 29
8.5.1
Temporary setting of the LED............ 29
8.5.2
Permanent setting of the LED ............ 29
8.6
M
UTING THE BUZZER
.................................. 30
8.7
B
ACKLIGHT
................................................. 30
8.8
C
HECKING THE FUNCTIONS BEFORE USING THE
INSTRUMENT
........................................................... 31
8.8.1
Battery................................................ 31
8.8.2
Temperature....................................... 31
8.8.3
Ullage................................................. 31
8.8.4
Interface ............................................. 31
8.9
I
NSTALLATION OF THE INSTRUMENT
............ 32
8.10
U
LLAGE
/
INTERFACE MEASUREMENT
......... 32
8.11
R
EFERENCE HEIGHT
/
INNAGE MEASUREMENT
33
8.12
T
EMPERATURE MEASUREMENT
................... 34
9.
CARE AND MAINTENANCE ....................... 35
9.1
C
ARE
.......................................................... 35
9.2
C
HECKING THE BATTERY
............................ 36
9.2.1
Before starting gauging ..................... 36
9.2.2
During gauging .................................. 37
9.3
B
ATTERY REPLACEMENT
............................ 38
9.4
T
APE REPLACEMENT
................................... 39
9.4.1
Disconnecting the tape from the sensor
39
9.4.2
Disconnecting the tape from the
electronic box..................................................... 39
9.4.3
Disconnecting the tape from the reel
axle
40
9.4.4
Removing the tape from the frame ..... 40
9.4.5
Mounting the new tape....................... 40
9.5
S
ENSING PROBE REPLACEMENT
................... 41
9.5.1
Disconnecting the old sensing probe . 41
9.5.2
Connecting the new sensing probe..... 41
9.6
T
APE WIPERS REPLACEMENT AND REMOVING
OF TAPE COVER
....................................................... 42
9.7
D
ISPLAY UNIT REPLACEMENT
...................... 43
9.7.1
Disconnecting the old display unit ..... 43
9.7.2
Connecting the new display unit ........ 43
9.8
V
ERIFICATION AND CERTIFICATION OF TAPES
43
9.9
V
ERIFICATION AND ADJUSTMENT OF THE
READING INDEX
....................................................... 44
9.10
T
EMPERATURE VERIFICATION
..................... 45
9.10.1
Equipment required............................ 45
9.10.2
Preparing the Ice Point bath.............. 45
Содержание HERMetic UTImeter Rtex
Страница 55: ...50455 RTEX 0807 UTImeter Rtex 55 Figure 12 1 general assembly list of the main spare parts...
Страница 56: ...50455 RTEX 0807 UTImeter Rtex 56 Figure 12 2 display unit assembly TS 10210 details...
Страница 59: ...50455 RTEX 0807 UTImeter Rtex 59 Figure 12 5 storage tube SS1 Q1 TS 10184 details...
Страница 60: ...50455 RTEX 0807 UTImeter Rtex 60 Figure 12 6 storage tube SS1 Q2 TS 10183 details...
Страница 61: ...50455 RTEX 0807 UTImeter Rtex 61 Figure 12 7 storage tube SS2 Q2 with load TS 10182 details...
Страница 62: ...50455 RTEX 0807 UTImeter Rtex 62 Figure 12 8 tape cleaner details...
Страница 64: ......
Страница 65: ......
Страница 66: ......
Страница 67: ......
Страница 68: ......
Страница 69: ......
Страница 70: ......
Страница 71: ......
Страница 72: ......
Страница 73: ......
Страница 74: ......
Страница 75: ......
Страница 76: ......
Страница 77: ......