2

Warning! Risk of electric shock. 

To maintain the warranty,  

do not modify the cover. 

      

Wire the Grid Connections

A )  Use conductors sized per local code requirements taking into con-

sideration the voltage drop/rise and upstream breaker or fuse. The 

terminals accept wire range 1/0 to 250kcmil. Wires must be Class B 

or Class C only, and conductors with finer strands are not approved. 

Note that the rated maximum breaker size is 250 A.

B )  The terminal lugs on the left with four terminals are for the grid 

connection. Install L1 into the left-most terminal, L2 into the second 

from the left, L3 into the third from left and neutral at the remaining 

terminal. These connections require a 7/16 Allen wrench.

C )  Connect the ground to a ground lug. Ground connections requite 

a 5/16 Allen wrench. 

D )  Torque all connections as indicated by the 

Wiring Table

.

4

      

Wire Inputs from the Array (AC Branch Circuits)

A )  Use copper conductors sized to meet local code requirements and 

voltage drop/rise considerations. The terminals accept wire range 1/0 

to 250kcmil. Wires must be Class B or Class C only, and conductors 

with finer strands are not approved. 

B )  Connect the ground (green or green/yellow) to a ground lug. Ground 

connections require a 5/16 Allen wrench, and accept a wire range of 4 

to 2/0 AWG. 

C )  The terminal lugs on the contactor (on the right side of the box) 

with three terminals are for the array connection. Install L1 into the 

left-most terminal, L2 into the center, and L3 into the right. These 

connections require a 7/16 Allen wrench.

D )  Connect the Array neutral, if required, to the terminal block shared with 

the Grid connections.

E )  Torque connections as indicated by the 

Wiring Table

.

NOTE

Enphase IQ Series Microinverters use a two-wire system and 

do not use a Neutral. However, the IQ Envoy in the NPR still requires a 

Neutral from the load center.

Warning! Risk of equipment damage. 

Observe bend radius 

requirements when routing wires.

WIRING TABLE

Grid/Array Connection

Torque

250kcmil - 3/0

275 lbs•in.

2/0 - #6

120 lbs•in.

Copper conductors only, rated minimum 90°C. Follow 

NFPA 70 (NEC) or CSA C22.1 part 1 and all local 

codes.

      

Drill Holes to Accept Conduit

A )  Unlock and open the Three-Phase NPR cover.
B )  See the Conduit Entry diagram for the best locations to drill holes for conduit fittings. 

NOTE: When drilling, consider the internal parts of the NPR. Make sure that the holes do not interfere with the internal workings, mechanics, or the cover 

legs in the corners of the NPR. 

 

 

Best Practice:

 

Use a stepped drill bit to make the conduit holes. Using a hole saw may crack the plastic housing. As an alternative, use a sharp chassis 

punch with caution. 

C )  Use a snap punch or other type of center punch to prevent the drill from wandering. Drill a pilot hole with a smaller drill before using a step drill bit. 
D )  Use only UL-listed rain-tight hubs for wire entry into the enclosure.

3

Warning! Risk of equipment damage. 

Do not drill conduit 

holes on the top of the box or at any location that allows 

moisture ingress. 

1”

1”

23”

13”

11”

6”

4”

4”

8”

8”

24”

Conduit Entry

Location Bottom

Side

Conduit

Entry

Right

Side

1”

4.5”

8”

6”

30”

1”

4.5”

8”

30”

Conduit

Entry

Left

Side

Top

Back

1”

4”

6” 1”

25.4

25.4

584

330

279

152

102

102

203

203

610

Conduit Entry

Location Bottom

Side

Conduit

Entry

Right

Side

25.4

114

203

152

762

25.4

114

203

762

Conduit

Entry

Left

Side

Top

Back

25.4

102

152 25.4

Inches

mm

GRID

Contactor

L1

L2

L3

N

L1

L2

L3

GRID/

ARRAY

ARRAY

GND

Black

Red

Blue

W

hit

e

W

hit

e

Black

Red

Blue

Gr

n/Y

ello

w

Gr

n/Y

ello

w

Conduit entry diagram

Wiring diagram

Содержание NPR-3P-208-NA

Страница 1: ...tains Production CTs wired to the included IQ Envoy Use the Three Phase NPR to support the AC connections needed for an Enphase commercial solar installation The Three Phase NPR provides electrical connection between a three phase electrical grid and a three phase PV array During connection it monitors voltages on all three phases and if conditions occur loss of phase under over voltage etc that r...

Страница 2: ... the Wiring Table NOTE Enphase IQ Series Microinverters use a two wire system and do not use a Neutral However the IQ Envoy in the NPR still requires a Neutral from the load center Warning Risk of equipment damage Observe bend radius requirements when routing wires WIRING TABLE Grid Array Connection Torque 250kcmil 3 0 275 lbs in 2 0 6 120 lbs in Copper conductors only rated minimum 90 C Follow NF...

Страница 3: ...alling CTs it is important to match CT and sense voltage phases Be sure to consistently identify the three AC lines at three points the main load center feed the Envoy and the solar production circuit breaker Wire colors typically black red and blue may not always consistently identify L1 L2 and L3 If in doubt use a multimeter to check 5 NOTE Because of variance in load center design and main powe...

Страница 4: ...rial numbers from the installation map F Tap the Connect button This provisions the scanned devices on the Envoy G When prompted confirm the number of devices that you installed H If your system is in Hawaii or in a region that does not use the Factory Installed Grid Profile select and apply a grid profile to the devices The Device Communications LED lights solid green if all provisioned devices a...

Страница 5: ...al six digits of the IQ Envoy serial number E Launch Installer Toolkit and tap Connect to Envoy F Tap Network G Under Network Configuration tap Cellular The app displays Connec tion Status and an indication of signal strength H Check the connection status and verify that signal strength is at least two bars for adequate data transmission I Close the Three Phase NPR cabinet and lock it with padlock...

Страница 6: ...ck the breaker and wiring starting at the load center If all of the non productive microinverters are on the same branch check the breaker and wiring starting at the junction box for the affected branch If only one or scattered microinverters are not producing power first check to see that the AC connectors are fully seated Next check that each mod ule is providing the required startup voltage for...

Страница 7: ...itation est autorisée aux deux conditions suivantes 1 l appareil ne doit pas produire de brouillage et 2 l utilisateur de l appareil doit accepter tout brouillage radioélectrique subi même si le brouillage est susceptible d en compromettre le fonctionnement Industry Canada and FCC This device complies with Industry Canada license exempt RSS standard s and part 15 of the FCC rules Operation is subj...

Страница 8: ...to comply with the limits for a Class B digital device pursuant to part 15 of the FCC Rules These limits are designed to provide reasonable protection against harmful interference in a residential installation This equipment generates uses and can radiate radio frequency energy and if not installed and used in accordance with the instructions may cause harmful interfer ence to radio communications...

Отзывы: