background image

PREPARATION

A )  Download the Enphase Installer Toolkit mobile app and open it to log on 

to your Enlighten account. With this app, you can connect to 

the IQ Envoy to track system installation progress. To down-

load, go to 

enphase.com/toolkit

 or scan the QR code at right.

B )  Consumption metering is optional. If desired, consumption 

CTs are required (not included with NPR) and are installed 

in the system breaker panel, then wired into the NPR. Check 

the box for the following items:

• 

Enphase Three Phase NPR (IQ Envoy and LTE-M cell modem included 

and integrated within NPR)

• 

Enphase Three Phase NPR Quick Install Guide

 (this document)

C )  Make sure you have the following 

required

 items:

• 

Tools: screwdriver, Allen wrenches (5/16 & 7/16), pliers, and stepped bit drill.

• 

Overcurrent protection in the load center in accordance with NFPA  

70, §705.12.

• 

Suitable mounting hardware: use #10 (or larger) screws that are long 

enough to secure the unit to the vertical mounting surface

• 

Copper conductors rated for wet locations and sized to meet local 

code requirements and voltage drop/rise considerations. Torque 

values are listed on the label inside the unit.

• 

UL-listed rain-tight hubs for wire entry into the enclosure.

• 

Up to four padlocks as needed, to lock the Three Phase NPR cabinet.

D )  Consumption metering is optional. If desired, consumption CTs are 

required (not included with NPR) and are installed in the system breaker 

panel, then wired into the NPR. To do consumption metering (production 

metering is already included in NPR):

• 

Make sure you order three split-core consumption metering CTs (order 

CT-200-SPLIT).

• 

Check that there is enough space in the load center to install CTs. 

Do not install the CTs in a panel where they exceed 75% of the wiring 

space of any cross-sectional area within the load center.

  Q U I C K

  I N S T A L L  

G U I D E

 

(Model NPR-3P-208-NA)

How It Works

POWER LINE  

COMMUNICATIONS

CELLULAR 

COMMUNICATIONS

IQ Series  

Microinverters

Three Phase 

NPR

Load  

Center

Enphase 

Enlighten™

Installing the 

Enphase Three Phase NPR

The Enphase Three Phase Network Protection Relay™ (NPR) allows installation of single-phase Enphase IQ Series Microinverters™ in a three-phase (208/120 

VAC) system by providing a consistent, pre-wired protection solution for three-phase commercial 208/120 VAC applications. To install the Three Phase NPR, 

read and follow all warnings and instructions in this guide. Safety warnings are listed on the back of this guide. Professional installation is recommended.
The Three Phase NPR is an outdoor-rated, NEMA type 4 enclosure containing an Enphase IQ Envoy™ , Enphase Mobile Connect, LTE-M cell modem, isolation 

contactor, contact controller, backup power supply, terminal lugs, and wiring for IQ Envoy connections. The NPR also contains Production CTs, wired to the 

included IQ Envoy. Use the Three Phase NPR to support the AC connections needed for an Enphase commercial solar installation.
The Three Phase NPR provides electrical connection between a three-phase electrical grid, and a three-phase PV array. During connection, it monitors voltages 

on all three phases, and if conditions occur (loss of phase, under/over voltage, etc.) that require disconnection, removes the grid-to-array connection of all three 

phases. Operation is automatic with no setting or manual intervention. The Enphase IQ Envoy requires configuration setup as described in this guide.

NOTE

If needed, you can find an installation map at the back of any 

Enphase Microinverter Quick Install Guide.

 

NOTE

You must mount the Three-Phase NPR within 15º of vertical.

INSTALLATION — Part 1

Note that following instructions outline installation of the Three Phase 

NPR in two parts. To ensure successful device detection, complete Part 2 

after installing Enphase IQ Microinverters and/or Enphase Battery(ies).

Complete Installation Part 1 before installing Enphase Microinverters.

      Choose a Location and Install Mounting Bracket

A )  Chose a vertical surface in a readily accessible location, at least three 

feet (91 cm) off the ground if outdoors. Plan to install the Three Phase 

NPR at least 12 inches (30.5 cm) off the ground if installed indoors. 

B )  Consider the dimensions of the Three Phase NPR, easy access, box 

height, and length of cable when selecting the location. The Three Phase 

NPR is rainproof but not watertight.

C )  The Three Phase NPR is shipped with its mounting brackets wrapped 

and tied within the unit. After unboxing, open the door, remove the bag 

that contains the four mounting brackets and their screws, and install 

them into the screw inserts on the back of the enclosure.

1

PREPARATION, continued

E )  Decide how to connect the IQ Envoy to the Internet: Use the included 

Enphase Mobile Connect modem, wi-fi, or Ethernet. If using Ethernet, 

make sure you have the following items

• 

Ethernet cable: 802.3, Cat5E or Cat6, unshielded twisted pair (UTP). 

Do not use shielded twisted pair (STP) cable. 

• 

Ethernet requires that you install a ferrite bead (we recommend Fair-Rite 

0431167281) as close as possible to the IQ Envoy on the Ethernet cable.

F )   Create a paper installation map to record device serial numbers and 

positions in the array. You will scan this map later using Installer Toolkit 

and your mobile device.

• 

Write the IQ Envoy serial number on the paper installation map. Later, 

you will need to enter this number in Installer Toolkit. You can type it in 

manually or scan the label on the inside of the NPR door.

G )  Choose a mounting location that is structurally suited to bearing the 

weight of the unit. The wall must include studs that can bear 29 kg (64 

lbs) or can be of masonry or other suitable structure.

*

 

WARNING: 

The Three Phase NPR weighs 29 kg (64 lbs) and may require 

two persons to lift the unit.

Содержание NPR-3P-208-NA

Страница 1: ...tains Production CTs wired to the included IQ Envoy Use the Three Phase NPR to support the AC connections needed for an Enphase commercial solar installation The Three Phase NPR provides electrical connection between a three phase electrical grid and a three phase PV array During connection it monitors voltages on all three phases and if conditions occur loss of phase under over voltage etc that r...

Страница 2: ... the Wiring Table NOTE Enphase IQ Series Microinverters use a two wire system and do not use a Neutral However the IQ Envoy in the NPR still requires a Neutral from the load center Warning Risk of equipment damage Observe bend radius requirements when routing wires WIRING TABLE Grid Array Connection Torque 250kcmil 3 0 275 lbs in 2 0 6 120 lbs in Copper conductors only rated minimum 90 C Follow NF...

Страница 3: ...alling CTs it is important to match CT and sense voltage phases Be sure to consistently identify the three AC lines at three points the main load center feed the Envoy and the solar production circuit breaker Wire colors typically black red and blue may not always consistently identify L1 L2 and L3 If in doubt use a multimeter to check 5 NOTE Because of variance in load center design and main powe...

Страница 4: ...rial numbers from the installation map F Tap the Connect button This provisions the scanned devices on the Envoy G When prompted confirm the number of devices that you installed H If your system is in Hawaii or in a region that does not use the Factory Installed Grid Profile select and apply a grid profile to the devices The Device Communications LED lights solid green if all provisioned devices a...

Страница 5: ...al six digits of the IQ Envoy serial number E Launch Installer Toolkit and tap Connect to Envoy F Tap Network G Under Network Configuration tap Cellular The app displays Connec tion Status and an indication of signal strength H Check the connection status and verify that signal strength is at least two bars for adequate data transmission I Close the Three Phase NPR cabinet and lock it with padlock...

Страница 6: ...ck the breaker and wiring starting at the load center If all of the non productive microinverters are on the same branch check the breaker and wiring starting at the junction box for the affected branch If only one or scattered microinverters are not producing power first check to see that the AC connectors are fully seated Next check that each mod ule is providing the required startup voltage for...

Страница 7: ...itation est autorisée aux deux conditions suivantes 1 l appareil ne doit pas produire de brouillage et 2 l utilisateur de l appareil doit accepter tout brouillage radioélectrique subi même si le brouillage est susceptible d en compromettre le fonctionnement Industry Canada and FCC This device complies with Industry Canada license exempt RSS standard s and part 15 of the FCC rules Operation is subj...

Страница 8: ...to comply with the limits for a Class B digital device pursuant to part 15 of the FCC Rules These limits are designed to provide reasonable protection against harmful interference in a residential installation This equipment generates uses and can radiate radio frequency energy and if not installed and used in accordance with the instructions may cause harmful interfer ence to radio communications...

Отзывы: