AC Combiner Box Installation
Enphase Installer
Toolkit mobile app
Pre-installation Checks
Review the following pre-installation checks before you install the AC Combiner Box.
Plan the Internet Connection
To use the
Enlighten
web-based monitoring and analysis software, additional requirements are:
•
Internet connection for the Envoy-S through a traditional router or modem or Enphase Mobile
Connect (Enphase model CELLMODEM-01). Decide whether to connect the Envoy-S to the
Internet using integrated Wi-Fi, an Enphase Mobile Connect modem, or using Ethernet cable with
or without a power line communication (PLC) bridge.
•
One of the following Web browsers with cookies enabled: Chrome 5 or higher, Firefox 11 or
higher, Internet Explorer (IE) 9 or higher, or Safari 5 or higher
Download the Installer Toolkit
The Enphase Installer Toolkit is a mobile app for iOS and Android devices that allows
installers to configure the system while onsite, eliminating the need for a laptop and
improving installation efficiency.
•
Download the Enphase Installer Toolkit mobile app and open it to log in to
your Enlighten account. With this app, you can connect to the Envoy to
track system installation progress. To download, go to
enphase.com/installer-toolkit
or scan the QR code:
•
To run the Installer Toolkit app, you need either of the
following mobile devices:
−
An Android mobile device running Android version
4.2 or later, or
−
An iOS device running iOS 7.0 or later, specifically an iPhone 4 or later
or an iPod Touch 5th generation
Box Contents
Check the shipping box for the following items:
•
Enphase AC Combiner Box with Envoy-S
•
Ferrite bead to attach to your Ethernet Cable, if used
•
The
Enphase AC Combiner Box Quick Install Guide
Required Items
•
Tools, including screw driver, pliers, torque wrench, etc.
•
Overcurrent protection in accordance with NFPA 70-2014, §705.12(D)
•
Suitable mounting hardware: use screws that are long enough to secure the unit to the vertical
mounting surface
•
75°C or 90°C copper conductors, rated for wet locations
•
UL listed rain-tight or wet location hubs for wire entry into the enclosure
Optional Items
Make sure you have the following optional items, if needed:
•
Two consumption metering split-core CTs (order two CTs: Enphase CT-200-SPLIT)
© 2016 Enphase Energy Inc.
141-00030 Rev 02
8