Copyright 2011 Enphase Energy
141-00014 Rev 01
e
n
g
l
i
s
h
7
Envoy Installation
Preparation
Before installing the Envoy, make sure that the site meets the following minimum
requirements:
Standard AC electrical outlet is available
Tools Required:
Laptop or other computer for Envoy set up
Two #8 (4.166 mm or 0.164 inch diameter) screws and a screwdriver for
wall-mounting the Envoy (optional)
If you plan to use Enlighten
web-based monitoring and analysis, additional
requirements include:
Always-on broadband Internet connection
Broadband router with spare Ethernet port.
Up-to-date web browser to view Enlighten. Supported browsers are Internet
Explorer 8 or higher, Firefox 3.6 or higher, Chrome 5 or higher, and Safari 4
or higher. Enlighten requires Adobe Flash Player 10 or higher.
Check the Envoy shipping box for the following items:
Envoy Communications Gateway
Ethernet cable
AC power cord
Power line communication bridges
Envoy Installation and Operation Manual
Read This First document
Installation Flow
Содержание Envoy Communications Gateway
Страница 5: ...Installation and Operations Manual Envoy Communications Gateway ...
Страница 50: ...Copyright 2011 Enphase Energy 141 00014 Rev 01 e n g l i s h 46 ...
Страница 51: ...Copyright 2011 Enphase Energy 141 00014 Rev 01 e n g l i s h 47 ...
Страница 53: ...Manuel d installation et d utilisation Passerelle de communication Envoy ...
Страница 99: ...Copyright 2011 Enphase Energy 141 00014 Version 01 f r a n ç a i s 47 ...