background image

INSTALLATION

       Plan a location for the IQ Batteries

The IQ Battery housing is NEMA type 3R and can be installed indoors or out-

doors. The terminal blocks accepts copper conductors of No. 14 - 8 AWG.
A ) 

Following local standards, 

choose a well-ventilated location where 

the ambient temperature and humidity are within -15° C to 55° C 

(5° F to 131° F) and 5% to 100% RH, non-condensing, preferably out 

of direct sunlight. The optimum ambient temperature range for 

installation location is  0º C to 30º C (32º F to 86º F).

B ) 

Ensure that the mounting location can sustain the total weight 

of the IQ Batteries and mounting bracket. 

Total weight for the IQ 

Battery 3, including the IQ Battery base unit, cover and wall mount 

bracket, is 52 kg (114.6 lbs). Total weight for the IQ Battery 10, 

including the three IQ Battery base units, cover, and wall mount 

bracket, is 154.7 kg (341 lbs).

*

 

WARNING: 

The installer should install blocking between studs 

to ensure that no single stud carries the entire weight load of the 

IQ Batteries.

C )  Plan the mounting location to be at least 15cm (six inches) off the 

ground and 15cm (six inches) from the ceiling. Keep the IQ Battery 

away from falling or moving objects, including motor vehicles.

*

 

WARNING: 

If mounted in the path of a motor vehicle, we 

recommend a mounting height that is 91 cm (36-inch) minimum 

above the floor.

D )  Ensure that there are no pipes or electrical wires where you plan to drill.
E )  Plan to maintain at least three feet of clearance in front of each 

IQ Battery. Allow at least 15cm (six inches) clearance on top and 

bottom of the IQ Battery so that the vents on the top and bottom of 

the units are not blocked for air circulation.

F )  Consider the dimensions of the IQ Batteries, easy access, height, 

and length of cable when selecting the location. 

G )  Select a location where you can interconnect to the Enphase IQ 

System Controller.

H )  Follow all local standards. 
J )  Review your external conduit plan to determine to which side of the 

field wiring compartment you will connect conduit.

K )  Up to two IQ Battery 10 (or six IQ Battery 3) units can be daisy 

chained on a single branch circuit. For installations with more than 

this number of units, there must be a separate load center, subpanel, 

or circuit combiner with over current protection to combine the 

daisy chained circuits, and you must run only one circuit for all 

the IQ Battery units to the IQ System Controller (or to Enphase IQ 

Combiner for grid-tied-only installations). You must select proper 

conductors and circuit breakers for these circuits according to local 

codes, standards, and other applicable requirements. IQ System 

Controller supports up to a maximum of 80 A breaker for IQ Battery 

connection circuit. 

 

The subpanel could be a small, two circuit box with circuit breakers. 

The circuit breakers in the box would have to be suitable for 

back-feeding, per NEC 408.36(D). 

 

Select the right size subpanel and breakers based on the number of 

IQ Battery units being installed. Up to four IQ Battery 10s or twelve IQ 

Battery 3s can be safely connected to 80A load center.

 

To do this, you must purchase an off-the-shelf subpanel and install 

as shown in the following image: 

       

WARNING!

 Parallel power production sources only. Do not 

connect load circuits.

1

       Install the AC disconnect

Following all local codes and standards:

 

A )  Install an AC disconnect that can break the maximum rated current 

of the branch circuit under load. The AC disconnect must be readily 

accessible and located within line-of-sight of IQ Battery, per NEC 

2017 706.7(A).

B )  Each IQ Battery unit is suitable for use with up to No. 8 AWG wires 

on a maximum 40 A branch circuit. If more than 32 A of IQ Battery 

batteries (corresponding to a 40 A branch circuit) are installed, a 

separate subpanel must be installed between the IQ Battery units 

and IQ System Controller to combine the IQ System Controller 

circuits together. All circuit breakers in the subpanel must be 

suitable for back-feeding, per NEC 408.36(D).

C )  Verify that AC voltage at the site is within range: single-phase L1 to L2 

voltage must measure between 211 and 264 VAC, while L-N should 

measure between 106 and 132 VAC.

2

     Prepare to install the wall-mount bracket

A )  Make sure that the planned position for the wall-mount bracket 

meets clearance requirements as shown. The image depicts a 

single bracket, but clearances and requirements are the same for 

the triple-width bracket.

B)    Ensure that the mounting location can sustan the weight of the 

IQ Batteries and mounting bracket. Total weight for the IQ Battery 

3 including the mounting brackets and cover is 52 kg (114.6 lbs), 

while the total weight for IQ Battery 10 including the mounting 

bracket and cover add up to 154.7 kg (341 lbs).

 

C )  Starting at installation position closest to the power source, mark a 

level line on the wall as a guide. 

WARNING!

 Multiple risks. Make sure not to drill or attach into 

electric wiring or pipes that are in the wall!

3

Minimum 15cm 

(6 inches) from 

ground/next 

surface below

Minimum 15cm 

(6 inches) from 

 

ceiling/next 

 

surface above

Blocking installed 

between studs

Wood screw 

7.6 cm (#10x3”)

IQ Battery

Wall  

sheathing

Mounted 

 

bracket

Wood stud

Mounting Surface 

Flatness (Across 

the Installation 

width and height) 

recommended to 

be within 2mm*

NOTE

:

 

The above specified surface flatness requirment is applicable to all 

the combinations of IQ Battery 3 and 10.

 

* If the difference in flatness is more than 2mm, recommend installing a substructure like unistrut for 

better alignment of the units.

MOUNTING WALL

ENCHARGE

ENCHARGE

Single circuit between combined 

Encharge and Enpower

Содержание ENCHARGE-3-1P-NA

Страница 1: ...guration for back up of the entire main load panel This configuration supports up to an 80A breaker for the PV circuit and an 80A breaker for battery storage Whole home backup with IQ System Controller as service entrance and PV combiner connected to main load panel This is the preferred configuration when you back up the entire main load panel and the size of the PV combiner circuit is more than ...

Страница 2: ...t screwdriver socket wrench torque wrench level wire stripper and stud finder if installing on studs Fasteners for wall mount bracket Slots are 6 8mm 0 27 Check with a structural engineer and local standards for requirements Single wide bracket Three 1 4 lag bolts or screws 7 6 cm 3 inches long depending on attachment wall Triple wide bracket Nine 1 4 lag bolts or screws 7 6 cm 3 inches long depen...

Страница 3: ...ction circuit The subpanel could be a small two circuit box with circuit breakers The circuit breakers in the box would have to be suitable for back feeding per NEC 408 36 D Select the right size subpanel and breakers based on the number of IQ Battery units being installed Up to four IQ Battery 10s or twelve IQ Battery 3s can be safely connected to 80A load center To do this you must purchase an o...

Страница 4: ... mounting holes on the left and right align with the adjacent studs B Use a level to keep the bottom of the wall mount bracket level C Use 1 4 screws or masonry attachments for masonry to attach the bracket using one screw and washer for each slot 6 8mm 0 27 Use screws in each section of the mounting bracket to support the three IQ Battery units There is an array of slots so that you can choose th...

Страница 5: ...J Use a Phillips screw driver to loosen the screws securing the field wiring compartment cover and remove the cover Keep the cover and screws handy as you will need them later K Attach the battery to the mounting bracket aligning the screw hole at the top of the battery with the screw hole at the top of the bracket L To record the installation of each IQ Battery base unit scan the serial number la...

Страница 6: ...to its correspond ing conductor Lines and Ground Each terminal accepts two 14 8 AWG conductors 11mm 7 16 inch strip length Tighten to 14 lb in G If installing an IQ Battery 10 route the wires from the first IQ Battery to the adjacent IQ Battery through the inter unit raceway There are two positions for each line and for ground in the terminal block to allow for daisy chaining WARNING Risk of equip...

Страница 7: ...crews to attach the cover to the batteries Tighten the screws as needed 8 IQ Battery 10 without cover A Use the Enphase Installer App to commission the IQ Battery ies Once connected to the IQ Gateway refer to the Enphase Installer App help topics for more information B After the IQ Gateway has detected the IQ Battery ies the IQ Battery LEDs operate as described in the following section CONFIGURE a...

Страница 8: ... the IQ Battery ies in storage ensure that AC power is not present and that the DC switch is in the Locked position While in storage damage to the battery can occur from over discharge If the battery state of charge falls to 0 the IQ Battery ies can be damaged or destroyed Because of this the IQ Battery ies must only be stored for a limited amount of time The IQ Battery ies must be installed and e...

Отзывы: