background image

  Q U I C K

  I N S T A L L  

G U I D E

 

(Models ENCHARGE-3T-1P-NA and ENCHARGE-10T-1P-NA)

Install the Enphase 

Encharge Storage System

To install the Enphase

 

Encharge 3T

™ storage system or 

Encharge 10T

™ storage system and the Enphase wall-mount bracket, read and follow all warnings and 

instructions in this guide. Safety warnings are listed on the back of this guide. These instructions are not meant to be a complete explanation of how to design 

and install an energy storage system. All installations must comply with national and local electrical codes and standards. 

Only qualified electricians shall 

install, troubleshoot, or replace the Encharge 3T or Encharge 10T.
The Encharge

 storage system includes the Enphase Encharge Battery(ies) with integrated Enphase IQ

™ 

Microinverters. The Enphase IQ Envoy™ commu

-

nication gateway measures PV production and home energy consumption. The Encharge storage system senses when it is optimal to charge or discharge 

the battery so that energy is stored when it is abundant and used when scarce. Encharge storage systems are capable of providing backup power when an 

Enphase Enpower

 smart switch is installed at the site.

For installing Encharge with 3rd party PV inverter please refer to the planning guide document on Enphase Energy Storage System for third party PV invert

-

ers online on Enphase website.

Five unique installation  

scenarios are shown:

Whole home backup with Enpower 

as service entrance and PV combiner 

connected to Enpower. 

This is the preferred 

configuration for back up of the entire main 

load panel. This configuration supports up 

to an 80A breaker for the PV circuit and an 

80A breaker for battery storage.

Whole home backup with Enpower 

as service entrance and PV combiner 

connected to main load panel. 

This is the 

preferred configuration when you back up 

the entire main load panel, and the size of 

the PV combiner circuit is more than 80A. In 

this configuration, the PV combiner circuit 

connection space in Enpower is left vacant. 

When existing PV combiner circuits are 

connected to the main load panel, and you 

want to add battery storage to the system, 

you can keep the PV combiner connected 

to the main load panel and connect only the 

battery storage system to Enpower.

Partial home backup with main load panel 

as service entrance and PV combiner 

connected to Enpower. 

When PV circuits 

breaker size is less than 80A, this is the 

preferred configuration for partial home 

backup with subpanel.

© 2021 Enphase Energy. All rights reserved. Enphase, the Enphase logo, Enpower smart switch, Encharge storage system, IQ Envoy, IQ combiner, IQ microinverter, 

Installer Toolkit, Enlighten and other trademarks or service names are trademarks of Enphase Energy, Inc. Data subject to change. Rev06- 10-21-2021

NOTE:   

                                                                                        

1. For M215/M250 connection to 

Ensemble, refer tech brief at 

https://

enphase.com/en-us/storage-m-series

                                                                                   

2. M series microinverters require Envoy-S 

metered.

Содержание ENCHARGE-10T-1P-NA

Страница 1: ...que installation scenarios are shown Whole home backup with Enpower as service entrance and PV combiner connected to Enpower This is the preferred configuration for back up of the entire main load panel This configuration supports up to an 80A breaker for the PV circuit and an 80A breaker for battery storage Whole home backup with Enpower as service entrance and PV combiner connected to main load ...

Страница 2: ...ch torque wrench level wire stripper and stud finder if installing on studs Fasteners for wall mount bracket Slots are 9 2mm 0 36 Check with a structural engineer and local standards for requirements Single width bracket for Encharge 3T A minimum of three 20 5 16 lag bolts or screws 7 6 cm 3 inches long depending on attachment wall Triple width bracket for Encharge 10T A minimum of nine 20 5 16 la...

Страница 3: ...ts according to local codes standards and other applicable requirements Enpower supports up to a maximum of 80 A breaker for Encharge connection circuit The subpanel could be a small two circuit box with circuit breakers The circuit breakers in the box would have to be suitable for back feeding per NEC 408 36 D Select the right size subpanel and breakers based on the number of Encharge units being...

Страница 4: ...9 2mm 0 36 Use with a minimum of nine screws in each mounting bracket to support the three Encharge battery units There is an array of slots so that you can choose those that allow you to mount the bracket on studs Tighten all screws to manufacturer s specified torque values D Verify that the wall mount bracket is solidly attached to the wall WARNING Risk of injury and equipment damage Do not moun...

Страница 5: ... compartment to accommodate the conduit B Connect field wiring to the top three terminal blocks C Size the conductors Lines and Ground to account for voltage rise and to conform to the tables below Design for a voltage rise total of less than 2 Encharge can use any circuit breaker size between 10 A and 40 A Breaker rating and wire size are installation dependent Number of Encharge E3T E10T units C...

Страница 6: ...charge 3T Cover and energize the system WARNING Before energizing make sure that ALL Encharge Bat teries in the system are properly installed and conductors terminated WARNING Risk of equipment damage Ensure that no wires are pinched before replacing the cover NOTE Check the box for updates on cover installation instructions IMPORTANT The section 8 and 9 will depict instructions for assemby and di...

Страница 7: ...harge cover B Using the hand access slots pull the top plastic grill slightly in the direction shown below in order to unlock the top plastic cover from the ribs highlighted in red Encharge 10T Cover Encharge 3T Cover Encharge 3T Cover Hand Access slots NOTE Only for reference purpose the Enchage 10T Cover image is shown above for locking Cover and energize the system continued B Turn ON the AC po...

Страница 8: ... is restored it automatically starts up again C If you do not see Encharge information in Enlighten check that the IQ Envoy and the Internet connection are working If the issue persists contact Enphase Customer Support at enphase com en us support contact A Use the Enphase Installer Toolkit to commission the Encharge Battery ies Once connected to the IQ Envoy refer to the Installer Toolkit help to...

Страница 9: ... the Encharge Battery ies in storage ensure that AC power is not present and that the DC switch is in the Locked position While in storage damage to the battery can occur from over discharge If the battery state of charge falls to 0 the Encharge Battery ies can be damaged or destroyed Because of this the Encharge Battery ies must only be stored for a limited amount of time The Encharge Battery ies...

Отзывы: