Breaker installation positions are noted in the diagram:
A )  Ensure that the IQ System Controller 2 is completely de-energized.
B )  Open the three latches that lock the enclosure door. To release the 

latch, pull the latch handle forward and then to the right. With all the 

latches opened, swing open the enclosure door. 

WARNING

: Risk of equipment damage. Do not remove the 

pre-installed solar shield attached to the enclosure door.

C )  Use a Phillips screw driver to loosen the six screws along the 

periphery of the deadfront. Support the deadfront to keep it from 

falling while performing the next step. 

D )  While supporting the deadfront, use a screwdriver to disconnect the 

deadfront ground wire from the grounding bar before the deadfront is 

removed.

E )  Use the two tabs on the front to assist handling the deadfront during 

the removal. Keep the deadfront and screws handy as you will need 

them later.

WARNING

: Risk of electric shock. To maintain the warranty, do 

not modify the deadfront other than to remove or replace filler plates, 

as needed.

F )  If you install a main breaker or load breaker, remove the standard lugs 

before installing the Eaton CSR breaker. By default, lugs are provided in 

the IQ System Controller 2 unit for connection to the mains and to the 

load. In case of usage without breakers, the conductors are connected 

directly to these lugs. When breakers are used, the lugs are replaced 

with breakers during installation. 

G )  Remove a filler plate from the deadfront for each breaker position 

you will use. Refer to the breaker position diagram to the left. To 

remove the filler plate, press the two snaps inward while gently 

pushing the filler plate out.

H )  For the IQ Battery, AC Combiner or Generator (optional) connection, 

snap the appropriately sized BR series two-pole Eaton breaker onto the 

busbar, using only the breaker positions indicated in the diagram on the 

door of the unit. The wires to be connected to each breaker are located 

beside each breaker position. Remove the heatshrink cap on the wire 

ends before inserting into the breaker.

I )  There are three ways of installing the IQ Gateway breaker: 

       

Option 1:

 Unwire and remove the IQ Gateway breaker from the IQ Com-

biner, wire L1 and L2 from IQ Gateway terminals through the PV conduit 

to IQ System Controller,  insert IQ Gateway breaker onto the bottom right 

position on IQ System Controller busbar (earlier reserved for generator),  

wire IQ Gateway L1 and L2 to IQ Gateway breaker on IQ System Control

-

ler busbar.

       

Option 2:

 Unwire and remove IQ Gateway breaker inside IQ Combiner , wire 

L1 and L2 from IQ Gateway terminals through the PV conduit through IQ 

System Controller to backup panel ,insert IQ Gateway breaker onto an 

available space on backup loads panel,wire IQ Gateway L1 and L2 to IQ 

Gateway breaker on backed up loads panel.Generator breaker position is 

free to be used with generator.

       

Option 3: 

Unwire and remove IQ Gateway breaker inside IQ Combiner, 

unwire and remove NFT breaker inside IQ System Controller and insert 

quad breaker (BRK-20A40A-4P-240V) in the NFT position, wire L1 and L2 

from IQ Gateway terminals 

through the PV conduit to IQ 

System Controller, wire IQ 

Gateway L1 and L2 and 

NFT L1 and L2 to the quad 

breaker. Generator breaker 

position is free to be used 

with generator.

J)   The bottom right breaker 

position can be used for the 

below purposes :

1.    Power the IQ Gateway
2.    Interconnect with the 

Generator (optional)

3.    Power the control 

transformer to enable the 

auxiliary contact load/PV 

shedding feature

4.    Connect the subpanel 

backup load breaker for <100A load subpanel. You can connect the 

main breaker of the subpanel to this position, since the load side lugs 

in IQ System Controller do not support <100A breaker or <1AWG wires.

       Ensure you stick the “GENERATOR” or “BACKUP LOADS” label, on top of 

the “IQ Gateway” embossing, on the IQ System Controller deadfront per 

the usage.

K )  Install each breaker by rocking it to the left, catching the clips that hold it in 

place. Then rock the breaker to the right so it is fully seated and secure.

L )  For the main load breaker, use an appropriately sized CSR Eaton breaker. 

Install at the location indicated in the diagram on the door of the unit. 

M ) Remove the mains/load lugs by unscrewing the two nuts holding the lugs. 

Re-use the same nuts to fix the CSR breakers in the same position. Torque 

to 4 N•m (35.4 lb•in).

N )  Use the 8-32 screw (from the lit kit marked 150-00148 that ships with the IQ 

System Controller 2) to secure the mains breaker (not the load breaker). Use 

a T20 drive to 

tighten the 8-32 screw to 1.5 N

m (13.3 lb

in)

. Do not use any 

other screw. 

O )  Check that all breakers are properly seated.
P )  Use the included stowed conductors, as labeled, to wire the circuit 

breaker(s) for the IQ Batteries, IQ Combiner, and generator (optional), as 

needed. The stowed conductors are provided with crimped-on ferrules 

with end caps to prevent accidental contact. Remove the conductor end 

caps as needed. 

Q )  Torque the breaker connections as listed in the following and 

in the 

conductor table on the unit

.

R )  Purchase and install two circuit breaker hold-down screw kits (SKU: 

EP200G-NA-HD-200A) to secure the IQ Battery and generator double-pole 

circuit breakers. 

Connections

Wire size (AWG)

Torque (N•m / lb•in)

Main lugs

Backup load lugs (use a 1/4” hex drive) Cu/AL: 300 KCMIL - 1

31.1 / 275

CSR breaker bottom wiring lugs

Cu/AL: 300 KCMIL - 2

28.2 / 250

BR breakers (wire provided)

6

3.1 / 27

AC Combiner lugs, 

IQ Battery lugs, and

Generator lugs

14 - 10

8

4 - 6

2 - 3

2.8 / 25

3.4 / 30

3.9 / 35

4.5 / 40

Neutral - large lugs (use a 3/8” hex drive)

Cu/AL: 300 KCMIL - 6

31.1 / 275

Neutral and ground bars

     Large holes (5/16-24 UNF)

1/0 - 3

4 - 6

8

10 -14

5.6 / 50

5.1 / 45

4.5 / 40

4.0 / 35

     Small holes (10-32 UNF)

6 - 8

10 -14

2.8 / 25

1.7 / 15

Required practices when 

torquing connections:

• 

Always follow NEC 

2017 110.4 (D) 

dictates. 

• 

You must use a cali-

brated torque tool to 

achieve the indicated 

torque values.

• 

Use tamper-proof 

torque mark/

paint after torquing 

connections.

Load breaker

AC Combiner

breaker

IQ Battery  

breaker

Generator  

breaker

Mains breaker

Ground wire

Install 8-32 

screw with 1.5 

N•m torque

CSR breaker upper 

lugs: 4 N•m torque

CSR breaker bottom 

wiring lugs: 28.2 N•m 

torque

Содержание BRK-100A-2P-240V

Страница 1: ...roviding a consistent pre wired solution for residential applications Along with MID functions it includes PV storage and generator input circuits 2021 Enphase Energy All rights reserved Enphase the Enphase logo IQ System Controller 2 IQ Battery IQ Gateway IQ combiner IQ microinverter Enphase App and other trademarks or service names are the trademarks of Enphase Energy Inc Data subject to change ...

Страница 2: ... for local requirements Washers for use between fastener heads and wall mount bracket Conductors rated at 75 C For sizes refer to the table on the unit and to local codes Over current protection maximum in accordance with local standards The door sheet metal is not required to be grounded since it is pro tected from live parts by other grounded metal and insulating plastic materials thus is consid...

Страница 3: ...w engages with the hole in the bracket to prevent vertical movement of the bracket WARNING Risk of injury and equipment damage Do not skip this step Without these screws in place the IQ System Controller 2 may fall and cause injury or damage if bumped or shaken K Use the four filler plates provided in the lit kit to cover the screws IQ System Controller 2 Wall Mount Bracket Align with stud Bracket...

Страница 4: ...tem Controller and insert quad breaker BRK 20A40A 4P 240V in the NFT position wire L1 and L2 from IQ Gateway terminals through the PV conduit to IQ System Controller wire IQ Gateway L1 and L2 and NFT L1 and L2 to the quad breaker Generator breaker position is free to be used with generator J The bottom right breaker position can be used for the below purposes 1 Power the IQ Gateway 2 Interconnect ...

Страница 5: ...DING ELECTRODE TERMINAL adjacent to the grounding bar From the lit kit place the label SUITABLE FOR USE AS SERVICE EQUIPMENT MAIN SERVICE DISCONNECT on the deadfront near the main breaker service disconnect If IQ System Controller 2 is not used as service equipment these labels should not be used E Connect Lines Neutral and Ground For details refer to the conductor table on the unit for sizes and ...

Страница 6: ...e service entrance of the the system controller The arrows on the Consump tion PCS CT must point towards the loads towards the busbar inside the IQ System Controller 2 Refer to the image on the next page for the Consumption PCS CT location and wiring to the IQ Gateway D You must protect all PCS controlled busbars and or conductors with suitably rated overcurrent devices that are appropriately size...

Страница 7: ...al Back side 20mm vertical x 20mm Horizontal Production CT CT 200 SOLID 9mm vertical x 30mm horizontal This sensor is part of a Power Control System Do not re move or disable Replace with same type and rating NOTE The maximum operating currents in controlled busbars or conductors are limited by the settings of the Power Control System PCS and may be lower than the sum of the currents of the connec...

Страница 8: ... is for connecting with a remote RSD switch It has two normal ly close auxiliary contacts NC3 NC4 and each auxiliary contact has two terminals Gen I O has one normally open auxiliary contact NO3 for generator control and this contact has three terminals All the auxiliary contact relays are rated for pilot duty at 24Vac Vdc nomi nal and 1 Amp A Auxiliary Contact connections for shedding excess PV a...

Страница 9: ...s to secure the headers to IQ System Controller 2 as shown in Feed through headers for I O 1 and I O 2 image 1 Insert the wires from the transformer controller and the external contactor into the feed through header NOTE Supports AWG 28 to AWG 16 wire sizes 2 Tighten the screws on the top torque 0 22Nm to 0 25Nm to secure the wires Follow same procedure for generator dry contact connections There ...

Страница 10: ...of generator CTs CT 200 SPLIT for L1 and L2 at the IQ System Controller 2 s Generator input terminal for power monitoring when the generator is running Detailed CT wiring is described in step 9 G Use Enphase Installer App mobile application to commission and pro gram IQ System Controller 2 to control the generator H For 2 wire autostart generators wire the Generator I O port in IQ System Controlle...

Страница 11: ...he arrow on the CT pointing towards the Generator breaker D Clamp the unmarked CT on Line 2 of the generator branch circuit inside the IQ System Controller 2 box with the arrow pointing towards the Generator breaker E Bring the CT lead wires out of IQ System Controller 2 to the standalone IQ Gateway or IQ Gateway in the IQ Combiner box F Use a screwdriver to loosen the screw on the IQ Gateway term...

Страница 12: ... to meet warranty requirements the IQ System Controller 2 must be installed and or stored according to the instructions in this guide NOTE The IQ System Controller 2 is compatible only with the IQ Combiner 4 4C fitted with USB hub USB radios and production and Consumption PCS CTs The IQ Combiner with the IQ Gateway inside is required for operation of the IQ System Controller 2 Earlier versions of ...

Отзывы: